Data
Information on the structure of tariffs for electricity supply services for each Universal Service Supplier (USS), which is set by the NEURC together with tariffs for electricity supply. Key indicators are: cost components that are included in the tariff calculation and costs in the current tariff.
Information on tariffs for electricity supply services for each Universal Service Supplier (USS) and information on the NEURC resolutions that regulate the setting of appropriate tariffs.
The tariff is calculated in accordance with the tariff structure established by the NEURC, and the tariff includes economically justified costs and calculated profit.
Information on changes in electricity tariffs for households occurred from 2012 to 2023. The tariffs were clarified by consumer group, location, and volume of electricity consumption.
In addition, if there is metering of electricity consumption for periods of time, consumer settlements are made at a fixed price using coefficients (at the consumer's choice):
1) by two-zone differentiation by periods:
- 0.5 fixed price from 11 pm to 7 am;
- full fixed price at other hours of the day.
2) by three-zone differentiation by periods:
- 1.5 fixed price from 8 am to 11 am and from 8 pm to 10 pm;
- 0.4 fixed price from 11 pm to 7 am;
- full fixed price at other hours of the day.
Information about the planned volume of gas distribution during the year, which is set by the NEURC together with tariffs and by which all tariff revenues are divided, is provided by the cost structure of regional gas companies. The number and date of the resolution, which contained information about the planned volume of distribution, are also indicated.
Information on the results of annual auctions on access to the capacity of Ukraine's cross-border electrical networks by direction of electricity supply. Key indicators include the date of the beginning and end of the auction reserve, the maximum and allocated capacity of cross-border networks, the limit price of electricity and information about the auction winning company, which acquired the right to export and/or import electricity.
According to the Ministry’s Resolution № 2452 of 01.12.2021, annual auctions on access to the capacity of cross-border electrical networks for 2022 are not planned.
Information on excise tax on fuel established in Ukraine since 2011.
Tax rates are determined by subparagraph 215.3.4 of Article 215 of the Tax Code of Ukraine and are set for different groups of goods according to the Ukrainian Classification of Goods for Foreign Economic Activity (UCG FEA).
The file contains information about the base load indexes, which were formed on the Bilateral Contracts Market (BCM) during the calendar quarter, the volume of trades and the cost of electricity sold.
Quarterly base load index – the average weighted price indicator calculated cumulatively, determined by dividing the total value of the sold electricity of the base load (without VAT) by the total volume of sold electricity, according to the period of supply, which covers the full calendar quarter, which is the next after the settlement qurter (Q+1).
By February 24, 2022, the indexes were calculated for the trade zone of the main part of the Integrated Power System (IPS) of Ukraine without taking into account the Burshtyn TPP Island.
Information on the ownership structure of gas Distribution System Operators (GDSO). The section of each DSO contains information about the owner of the securities and the size of his share in the company's capital, as well as information about the securities (form of issue, nominal value and quantity).
Information on the structure of tariffs for electricity distribution services according to the COST+ methodology, which is set by the NEURC together with tariffs for electricity distribution. Key indicators are: cost components that are included in the tariff calculation and costs in the current tariff.
As of 2024, 6 DSOs operate according to the "COST+" methodology, the rest – using the Regulatory Asset Base (RAB regulation).
Information on the structure of tariffs for transmission services by trunk and interstate electrical networks by the Transmission System Operator (TSO) NPC "Ukrenergo". Key indicators are: cost components that are included in the tariff calculation and costs in the current tariff.
NPC "Ukrenergo" as TSO provides transmission of electric power by trunk and interstate networks with a voltage of 110-750 kV from generation to the networks of Distribution System Operators (DSOs) with compliance with electricity and transmission quality criteria and it is responsible for the maintenance, reconstruction and development of the transmission system.
Information on tariffs for transmission services by trunk and interstate electrical networks established for the Transmission System Operator (TSO) NPC "Ukrenergo" by Regulator (NEURC).
The file contains information about the period of validity of the tariff, the date and the resolution number, which is set the tariff, and since 2023 the tariff is differentiated by the type of users.
Information on the structure of tariffs for services of dispatch (operational and technological) control of the integrated power system (IPS) of Ukraine by the Transmission System Operator (TSO) NPC Ukrenergo. Key indicators are: cost components that are included in the tariff calculation and costs in the current tariff.
Information on tariffs for services of dispatch (operational and technological) control of the integrated power system (IPS) of Ukraine, which are established for the Transmission System Operator (TSO) NPC Ukrenergo by Regulator (NEURC).
In terms of dispatch control, Ukrenergo ensures:
- transmission through the main networks from generation to distribution networks;
- technical maintenance, reconstruction, and development of the transmission system;
- centralized dispatch control of the power system to ensure a balance between electricity production and consumption;
- synchronous operation of the power system of Ukraine with the power grid of continental Europe (ENTSO-E);
- the ability to import and export electric power;
- prevention of violations of the power system operation modes, emergencies of systemic importance, ensuring the integrity of the power system of Ukraine.
Information on the structure of tariffs for electricity distribution services based on the Regulatory Asset Base (RAB), which is set by the NEURC together with tariffs for electricity distribution. Key indicators are: cost components that are included in the tariff calculation and costs in the current tariff.
RAB regulation is a system of long-term tariff formation, the main purpose of which is to attract investment in the development and modernization of electrical networks and stimulate the efficiency of DSOs' costs. Such regulation helps to reduce the cost and shorten the period of connection to the power grids of new consumers, improve the quality of the distribution service to existing consumers and reduce the loss of electricity in the networks.
As of 2024, 26 DSOs operate using RAB regulation, the rest - according to the "COST+" method.
Information on tariffs for electricity distribution services for each Distribution System Operator (DSO) for electricity consumers of the 1 and 2 voltage classes and information on the NEURC resolutions that regulate the setting of appropriate tariffs.
The tariff is calculated in accordance with the tariff structure established by the NEURC, and the tariff includes economically justified costs and calculated profit.
Information on the tariff structure can be found at the link.
Information on the actual values of the average duration of long outages in the system (SAIDI), which took place for urban and rural settlements, structured according to the electricity distribution licenses. The data are calculated as the ratio of the total duration of outages per year to the total number of customers.
Data for 2021-2022 is received from the NEURC upon request.
Information on the actual values of the average duration of long interruptions in the system (SAIDI), which occurred due to the fault of companies or due to planned interruptions, is structured by electricity distribution licensees. The data are calculated as the ratio of the total duration of outages per year to the total number of customers.
Data for 2021-2022 is received from the NEURC upon request.
One of the main indicators of the reliability (continuity) of electricity supply is the system average interruption duration index (SAIDI), calculated as the ratio of the cumulative length of long breaks at commercial power accounting points where power supply was interrupted during the reporting period to the total number of commercial counting posts.
The file contains information on the distribution of the number of long power breaks in the system according to their duration.
Data for 2021-2022 is received from the NEURC upon request.
Information on the capital invested in enterprises of extractive (extraction of natural gas, coal, oil, and other raw materials) and processing industries (production of coke and oil refining products), as well as in the supply of electricity, gas, and heat.
Capital investments include expenses for the acquisition or creation of assets: tangible (buildings and engineering structures, machinery and vehicles, equipment, land, etc.) and intangible (software and databases, copyright, patents, licenses, the right to use natural resources, etc.).