Information on the structure of tariffs for transmission services by trunk and interstate electrical networks by the Transmission System Operator (TSO) NPC "Ukrenergo". Key indicators are: cost components that are included in the tariff calculation and costs in the current tariff.

NPC "Ukrenergo" as TSO provides transmission of electric power by trunk and interstate networks with a voltage of 110-750 kV from generation to the networks of Distribution System Operators (DSOs) with compliance with electricity and transmission quality criteria and it is responsible for the maintenance, reconstruction and development of the transmission system.

Update date Dec. 20, 2023, 11:07 p.m. Not regularly
Coverage period 01.07.2019 - 31.12.2024
Organizations
National Power Company Ukrenergo
Sources
More Show
2024_12_31_uk_struktura_taryfiv_ukrenerho_peredacha.csv
Name: 2024_12_31_uk_struktura_taryfiv_ukrenerho_peredacha.csv
Format: UK CSV
Size: 25.20 KB
Count of rows: 175
Date updated: Dec. 20, 2023, 11:07 p.m.
2024_12_31_uk_struktura_taryfiv_ukrenerho_peredacha.xlsx
Name: 2024_12_31_uk_struktura_taryfiv_ukrenerho_peredacha.xlsx
Format: UK XLSX
Size: 10.23 KB
Count of rows: 175
Date updated: Dec. 20, 2023, 11:07 p.m.
2024_12_31_en_struktura_taryfiv_ukrenerho_peredacha.csv
Name: 2024_12_31_en_struktura_taryfiv_ukrenerho_peredacha.csv
Format: EN CSV
Size: 13.47 KB
Count of rows: 175
Date updated: Dec. 20, 2023, 11:07 p.m.
2024_12_31_en_struktura_taryfiv_ukrenerho_peredacha.xlsx
Name: 2024_12_31_en_struktura_taryfiv_ukrenerho_peredacha.xlsx
Format: EN XLSX
Size: 9.17 KB
Count of rows: 175
Date updated: Dec. 20, 2023, 11:07 p.m.
Name Format Size Count of rows Date updated
2024_12_31_uk_struktura_taryfiv_ukrenerho_peredacha.csv UK CSV 25.20 KB 175 Dec. 20, 2023, 11:07 p.m. Download
2024_12_31_uk_struktura_taryfiv_ukrenerho_peredacha.xlsx UK XLSX 10.23 KB 175 Dec. 20, 2023, 11:07 p.m. Download
2024_12_31_en_struktura_taryfiv_ukrenerho_peredacha.csv EN CSV 13.47 KB 175 Dec. 20, 2023, 11:07 p.m. Download
2024_12_31_en_struktura_taryfiv_ukrenerho_peredacha.xlsx EN XLSX 9.17 KB 175 Dec. 20, 2023, 11:07 p.m. Download
Field Name Description
date_start Date of beginning of validity

-

cost_level_1 Key indicators included in the tariff calculation

The list of components of the electricity transmission costs included in the tariff calculation as well as the volume of transmission / consumption, electricity export and the size of the final tariff

cost_level_2 Expenses type

Details of operational costs:
• material costs
• costs to offset technological flows of electricity
• labour costs
• contributions to social activities
• amortization
• expenditure on management of cross-border connections capacity allocation restrictions
• other operational costs
• adjustment of required income

amount Amount

Units of measurement:
• electricity transmission / consumption - MW
• tariff - UAH/MWh
• other types of expenses - thousand UAH

Field
Name
date_start
Date of beginning of validity
Description

-

Field
Name
cost_level_1
Key indicators included in the tariff calculation
Description

The list of components of the electricity transmission costs included in the tariff calculation as well as the volume of transmission / consumption, electricity export and the size of the final tariff

Field
Name
cost_level_2
Expenses type
Description

Details of operational costs:
• material costs
• costs to offset technological flows of electricity
• labour costs
• contributions to social activities
• amortization
• expenditure on management of cross-border connections capacity allocation restrictions
• other operational costs
• adjustment of required income

Field
Name
amount
Amount
Description

Units of measurement:
• electricity transmission / consumption - MW
• tariff - UAH/MWh
• other types of expenses - thousand UAH