Data
Information on the population payment level for housing and communal services: accrued and paid amounts, debt and information on the state of payment by the population of the restructured debt for housing and communal services from a regional perspective.
Debt restructuring is the equal distribution of debt for services rendered for up to 60 months.
Information on the level of payment of the population for the housing and communal services consumed and the debt stock by regions and types of services.
The absence of debt values means that the data controller has marked the data as confidential. As a result, it is not possible to calculate the total value for Ukraine independently, but it is available in the general file about population debts for payment of housing and communal services in Ukraine by link.
Information on the amount of debts of the population for payment of housing and communal services for Ukraine as a whole, indicating the types of services.
Daily information on the volumes of positive and negative imbalances in Ukrainian gas transmission system (GTS). According to GTS Code imbalance is a difference between volumes of natural gas, injected by the GTS customer at entry point of the GTS and volumes of natural gas withdrawn by the GTS customer at exit point, which is defined according to allocation.
Information on the installed electrical capacity of Ukraine’s thermal power plants (TPP), detailed by the fuel types on which the stations operate (coal, gas and fuel oil).
The data do not include the temporarily occupied territories of Ukraine.
Information on installed electricity production capacity of power plants of Ukraine, detailed by type of power plants: nuclear, cogeneration, renewable, thermal, hydroelectric, pumped storage power plants.
Information on the amount of electricity generated by generation facilities operating at a "green" tariff, by type of generation.
Detailed data on electricity production by each generation facility are available at the link.
Information on the amount of uranium ore (UO) extracted, the amount and cost of the prodused uranium raw material - uranium oxide concentrate (UOC) by the State enterprise "Eastern Ore Dressing Complex"
Information on unbalanced values of the reception and return of electric power between the main networks of the Integrated Power System (IPS) of Ukraine and the energy systems of neighbouring countries: Moldova, Slovakia, Hungary, Romania and up to 24.02.2022 - Russia and Belarus.
Information on actual volumes of exported and imported electricity, volumes of technological flows and emergency delivery (assistance) of electricity from / to the Integrated Power System (IPS) of Ukraine.
By February 24, 2022, the volumes of electric flows include flows caused by parallel operation of the Russian and Ukrainian power systems and flows for supplying the deadlocked areas of load for border consumers of the power systems of Belarus and Ukraine.
The volumes of emergency power supplies between the power systems include assistance in the event of a breach of system operation under the contracts "On ensuring emergency mutual power supply to ensure the reliability of the system" concluded between the Transmission System Operators (TSOs) of Ukraine and Belarus of 30.12.2020 and between the TSOs of Ukraine and Slovakia of 05.02.2021.
Information on the hydropower plants electricity generation of the PJSC Ukrhydroenergo. Data on daily production volumes by power plants.
Information on the amount of primary electricity sales on the Bilateral Contracts Market (BCM), up to 24.02.2022 separately for the main part of the Integrated Power System (IPS) of Ukraine and the Burshtyn TPP Island by delivery periods.
Information on planned and actual coal production by Ukrainian coal mining enterprises and mines. Information about coal ash content is indicated.
Information on planned and actual extraction of run-of-mine coal for energy purposes and coking by Ukrainian coal mining enterprises and mines.
Information on the amount and cost of electricity supplied by Energoatom SE to the wholesale electricity market (WEM), which operated in Ukraine until 1 July 2019. At the same time, the amount paid and the final debt to the Energoatom for the supplied electricity are indicated.
Information on the limits of of power for electricity consumption, which are set for each region of Ukraine for the period of control during the morning and evening maximum load of the power system.
Depending on the calculation period, the control periods are:
- in the morning from 8:00 / 8:30 to 10:00 / 10:30 / 11:00;
- in the evening from 16:30 / 17:00 / 17:30 / 18:00 / 19:00 / 20:00 to 20:30 / 21:00 / 21:30 / 22:00 / 23:00.
More detailed is described in the methodology.
Information on the limits of electricity consumption, which are set for each region of Ukraine for the period of control during the morning and evening maximum load of the power system.
Depending on the calculation period, the control periods are:
- in the morning from 8:00 / 8:30 to 10:00 / 10:30 / 11:00;
- in the evening from 16:30 / 17:00 / 17:30 / 18:00 / 19:00 / 20:00 to 20:30 / 21:00 / 21:30 / 22:00 / 23:00.
More detailed is described in the methodology.