Information on the amount of primary electricity sales on the Bilateral Contracts Market (BCM), up to 24.02.2022 separately for the main part of the Integrated Power System (IPS) of Ukraine and the Burshtyn TPP Island by delivery periods.

Update date Feb. 7, 2022, 6:09 p.m. Monthly
Coverage period 01.07.2020 - 04.02.2022
Organizations
National Power Company Ukrenergo
Sources
More Show
2022_02_04_uk_pervynnyi_prodazh_rdd.csv
Name: 2022_02_04_uk_pervynnyi_prodazh_rdd.csv
Format: UK CSV
Size: 548.42 KB
Count of rows: 13945
Date updated: Feb. 7, 2022, 6:08 p.m.
2022_02_04_uk_pervynnyi_prodazh_rdd.xlsx
Name: 2022_02_04_uk_pervynnyi_prodazh_rdd.xlsx
Format: UK XLSX
Size: 334.53 KB
Count of rows: 13945
Date updated: Feb. 7, 2022, 6:08 p.m.
2022_02_04_en_pervynnyi_prodazh_rdd.csv
Name: 2022_02_04_en_pervynnyi_prodazh_rdd.csv
Format: EN CSV
Size: 548.42 KB
Count of rows: 13945
Date updated: Feb. 7, 2022, 6:08 p.m.
2022_02_04_en_pervynnyi_prodazh_rdd.xlsx
Name: 2022_02_04_en_pervynnyi_prodazh_rdd.xlsx
Format: EN XLSX
Size: 334.45 KB
Count of rows: 13945
Date updated: Feb. 7, 2022, 6:08 p.m.
Name Format Size Count of rows Date updated
2022_02_04_uk_pervynnyi_prodazh_rdd.csv UK CSV 548.42 KB 13945 Feb. 7, 2022, 6:08 p.m. Download
2022_02_04_uk_pervynnyi_prodazh_rdd.xlsx UK XLSX 334.53 KB 13945 Feb. 7, 2022, 6:08 p.m. Download
2022_02_04_en_pervynnyi_prodazh_rdd.csv EN CSV 548.42 KB 13945 Feb. 7, 2022, 6:08 p.m. Download
2022_02_04_en_pervynnyi_prodazh_rdd.xlsx EN XLSX 334.45 KB 13945 Feb. 7, 2022, 6:08 p.m. Download
Field Name Description
date Date

-

time Hour

-

amount_ips Amount in the IPS of Ukraine, MWh

Amount of primary sales of electricity in the IPS of Ukraine, MWh
By February 24, 2022, two separate trade zones "Burshtyn energy island" and "Integrated Power System of Ukraine" existed because of the technical features of the Ukrainian energy system. In order to test the stability of the energy system in preparation for integration with ENTSO-E, the 24.02.2022 Ukrainian energy network was disconnected from the networks of all neighbouring countries and the internal systems were synchronized. Since that moment, there is a single trading zone for the entire energy system of Ukraine (in the file is specified as "IPS of Ukraine (synchronized with ENTSO-E systems)").
By February 24, for the calculation of Ukrainian indicators, it is necessary to sum up the value in both trade zones.

amount_burshtyn Amount in the Burshtyn energy island, MWh

Amount of primary sales of electricity in the Burshtyn TPP energy island (up to 24.02.2022), MWh

Field
Name
date
Date
Description

-

Field
Name
time
Hour
Description

-

Field
Name
amount_ips
Amount in the IPS of Ukraine, MWh
Description

Amount of primary sales of electricity in the IPS of Ukraine, MWh
By February 24, 2022, two separate trade zones "Burshtyn energy island" and "Integrated Power System of Ukraine" existed because of the technical features of the Ukrainian energy system. In order to test the stability of the energy system in preparation for integration with ENTSO-E, the 24.02.2022 Ukrainian energy network was disconnected from the networks of all neighbouring countries and the internal systems were synchronized. Since that moment, there is a single trading zone for the entire energy system of Ukraine (in the file is specified as "IPS of Ukraine (synchronized with ENTSO-E systems)").
By February 24, for the calculation of Ukrainian indicators, it is necessary to sum up the value in both trade zones.

Field
Name
amount_burshtyn
Amount in the Burshtyn energy island, MWh
Description

Amount of primary sales of electricity in the Burshtyn TPP energy island (up to 24.02.2022), MWh