Information on the participants of the energy efficiency support program for multi-apartment buildings called "Energodim," which is implemented by the Energy Efficiency Fund. The program offers partial reimbursement of costs for energy efficiency measures ranging from 40% to 70%. Housing cooperatives (OSBB) can utilize these funds for the installation of individual heating substations, hydraulic system balancing, insulation of pipelines, insulation of walls, roofs, and basement floors, replacement of doors and windows, and more.

The file contains information about program participants, including their name, address, date of application and accession to the program, details of energy efficiency measures taken, as well as information on reimbursements made, energy savings achieved, and reductions in emissions resulting from the implemented measures.

Update date April 18, 2024, 11:34 a.m. Monthly
Coverage period 01.09.2019 - 12.04.2024
Organizations
Energy Efficiency Fund
Sources
Collection methodologies
More Show
2024_04_12_uk_energodim_participants.csv
Name: 2024_04_12_uk_energodim_participants.csv
Format: UK CSV
Size: 1.37 MB
Count of rows: 950
Date updated: April 18, 2024, 11:33 a.m.
2024_04_12_uk_energodim_participants.xlsx
Name: 2024_04_12_uk_energodim_participants.xlsx
Format: UK XLSX
Size: 231.43 KB
Count of rows: 950
Date updated: April 18, 2024, 11:33 a.m.
2024_04_12_en_energodim_participants.csv
Name: 2024_04_12_en_energodim_participants.csv
Format: EN CSV
Size: 733.00 KB
Count of rows: 950
Date updated: April 18, 2024, 11:34 a.m.
2024_04_12_en_energodim_participants.xlsx
Name: 2024_04_12_en_energodim_participants.xlsx
Format: EN XLSX
Size: 131.28 KB
Count of rows: 950
Date updated: April 18, 2024, 11:34 a.m.
Name Format Size Count of rows Date updated
2024_04_12_uk_energodim_participants.csv UK CSV 1.37 MB 950 April 18, 2024, 11:33 a.m. Download
2024_04_12_uk_energodim_participants.xlsx UK XLSX 231.43 KB 950 April 18, 2024, 11:33 a.m. Download
2024_04_12_en_energodim_participants.csv EN CSV 733.00 KB 950 April 18, 2024, 11:34 a.m. Download
2024_04_12_en_energodim_participants.xlsx EN XLSX 131.28 KB 950 April 18, 2024, 11:34 a.m. Download
Field Name Description
name Participant name

-

address Participant address

-

date_submission Date of application submission

-

project_status Project status

The application is considered, rejected, approved, paid, etc.

date_change Date of project status change

-

date_joining Date of joining the program

-

measures_package Selected package of measures

Package "A" includes mandatory measures such as the installation of a commercial heat energy meter, modernization of heating systems, and hydraulic balancing of the heating system. It also includes optional measures, such as insulation of pipelines and other modernization actions at various levels of the building.

Package "B" encompasses all mandatory measures from Package "A" and adds comprehensive work on insulating external walls, roofs, basement ceiling slabs, and replacement or repair of external doors. In addition to this, Package "B" contains optional measures, such as modernizing the hot water supply system, insulating interior spaces, upgrading lighting and ventilation systems, and other modernization measures aimed at improving the energy efficiency of the building.

measures_list List of energy efficiency measures

-

savings_declared Energy savings as per project description, kwh/year

kwh/year

co2_declared CO2 emissions reduction as per project description, tons/year

tons/year

cost Estimated implementation cost of measures as per project description, UAH

UAH

paid_audit Partial reimbursement for the cost of the pre-energy audit, UAH

UAH

paid_documentation Partial reimbursement for the design and expertise of project documentation, UAH

UAH

paid_measures Partial reimbursement for implemented energy efficiency measures, UAH

UAH

paid_total Total amount paid to the participant, UAH

UAH

savings_actual Energy savings in the completed project, kwh/year

kwh/year

co2_actual CO2 emissions reduction in the completed project, tons/year

tons/year

Field
Name
name
Participant name
Description

-

Field
Name
address
Participant address
Description

-

Field
Name
date_submission
Date of application submission
Description

-

Field
Name
project_status
Project status
Description

The application is considered, rejected, approved, paid, etc.

Field
Name
date_change
Date of project status change
Description

-

Field
Name
date_joining
Date of joining the program
Description

-

Field
Name
measures_package
Selected package of measures
Description

Package "A" includes mandatory measures such as the installation of a commercial heat energy meter, modernization of heating systems, and hydraulic balancing of the heating system. It also includes optional measures, such as insulation of pipelines and other modernization actions at various levels of the building.

Package "B" encompasses all mandatory measures from Package "A" and adds comprehensive work on insulating external walls, roofs, basement ceiling slabs, and replacement or repair of external doors. In addition to this, Package "B" contains optional measures, such as modernizing the hot water supply system, insulating interior spaces, upgrading lighting and ventilation systems, and other modernization measures aimed at improving the energy efficiency of the building.

Field
Name
measures_list
List of energy efficiency measures
Description

-

Field
Name
savings_declared
Energy savings as per project description, kwh/year
Description

kwh/year

Field
Name
co2_declared
CO2 emissions reduction as per project description, tons/year
Description

tons/year

Field
Name
cost
Estimated implementation cost of measures as per project description, UAH
Description

UAH

Field
Name
paid_audit
Partial reimbursement for the cost of the pre-energy audit, UAH
Description

UAH

Field
Name
paid_documentation
Partial reimbursement for the design and expertise of project documentation, UAH
Description

UAH

Field
Name
paid_measures
Partial reimbursement for implemented energy efficiency measures, UAH
Description

UAH

Field
Name
paid_total
Total amount paid to the participant, UAH
Description

UAH

Field
Name
savings_actual
Energy savings in the completed project, kwh/year
Description

kwh/year

Field
Name
co2_actual
CO2 emissions reduction in the completed project, tons/year
Description

tons/year