Participants of the "Energodim" energy modernization program
Information on the participants of the energy efficiency support program for multi-apartment buildings called "Energodim," which is implemented by the Energy Efficiency Fund. The program offers partial reimbursement of costs for energy efficiency measures ranging from 40% to 70%. Housing cooperatives (OSBB) can utilize these funds for the installation of individual heating substations, hydraulic system balancing, insulation of pipelines, insulation of walls, roofs, and basement floors, replacement of doors and windows, and more.
The file contains information about program participants, including their name, address, date of application and accession to the program, details of energy efficiency measures taken, as well as information on reimbursements made, energy savings achieved, and reductions in emissions resulting from the implemented measures.
Field | Name | Description |
---|---|---|
name | Participant name |
- |
address | Participant address |
- |
region | Participant region |
- |
date_submission | Date of application submission |
- |
project_status | Project status |
The application is considered, rejected, approved, paid, etc. |
date_change | Date of project status change |
- |
date_joining | Date of joining the program |
- |
measures_package | Selected package of measures |
Package "A" includes mandatory measures such as the installation of a commercial heat energy meter, modernization of heating systems, and hydraulic balancing of the heating system. It also includes optional measures, such as insulation of pipelines and other modernization actions at various levels of the building. Package "B" encompasses all mandatory measures from Package "A" and adds comprehensive work on insulating external walls, roofs, basement ceiling slabs, and replacement or repair of external doors. In addition to this, Package "B" contains optional measures, such as modernizing the hot water supply system, insulating interior spaces, upgrading lighting and ventilation systems, and other modernization measures aimed at improving the energy efficiency of the building. |
measures_list | List of energy efficiency measures |
- |
savings_declared | Energy savings as per project description, kwh/year |
kwh/year |
co2_declared | CO2 emissions reduction as per project description, tons/year |
tons/year |
cost | Estimated implementation cost of measures as per project description, UAH |
UAH |
paid_audit | Partial reimbursement for the cost of the pre-energy audit, UAH |
UAH |
paid_documentation | Partial reimbursement for the design and expertise of project documentation, UAH |
UAH |
paid_measures | Partial reimbursement for implemented energy efficiency measures, UAH |
UAH |
paid_total | Total amount paid to the participant, UAH |
UAH |
savings_actual | Energy savings in the completed project, kwh/year |
kwh/year |
co2_actual | CO2 emissions reduction in the completed project, tons/year |
tons/year |
Name | Format | Size | Count of rows | Date updated | |
---|---|---|---|---|---|
2024_12_12_uk_energodim_participants.csv | UK CSV | 1.45 MB | 1025 | Dec. 20, 2024, 8:27 p.m. | Download |
2024_12_12_uk_energodim_participants.xlsx | UK XLSX | 258.50 KB | 1025 | Dec. 20, 2024, 8:27 p.m. | Download |
2024_12_12_en_energodim_participants.csv | EN CSV | 775.18 KB | 1025 | Dec. 20, 2024, 8:28 p.m. | Download |
2024_12_12_en_energodim_participants.xlsx | EN XLSX | 153.39 KB | 1025 | Dec. 20, 2024, 8:28 p.m. | Download |