Information on the transfer capacity of cross-border electrical networks for each settlement period. In hourly detail, given the information on the net and available transfer capacity of the cross-border networks, as well as the capacity allocated by the outcome of the auctions, with an indication of the direction of distribution.

Update date Sept. 28, 2022, 2:28 p.m. Monthly
Coverage period 22.09.2019 - 25.09.2022
Organizations
National Power Company Ukrenergo
Sources
More Show
2022_09_25_uk_propuskna_spromozhnist_peretyniv_na_kozhnyi_period.csv
Name: 2022_09_25_uk_propuskna_spromozhnist_peretyniv_na_kozhnyi_period.csv
Format: UK CSV
Size: 19.98 MB
Count of rows: 353360
Date updated: Sept. 28, 2022, 2:14 p.m.
2022_09_25_uk_propuskna_spromozhnist_peretyniv_na_kozhnyi_period.xlsx
Name: 2022_09_25_uk_propuskna_spromozhnist_peretyniv_na_kozhnyi_period.xlsx
Format: UK XLSX
Size: 8.17 MB
Count of rows: 353360
Date updated: Sept. 28, 2022, 2:16 p.m.
2022_09_25_en_propuskna_spromozhnist_peretyniv_na_kozhnyi_period.csv
Name: 2022_09_25_en_propuskna_spromozhnist_peretyniv_na_kozhnyi_period.csv
Format: EN CSV
Size: 14.60 MB
Count of rows: 353360
Date updated: Sept. 28, 2022, 2:24 p.m.
2022_09_25_en_propuskna_spromozhnist_peretyniv_na_kozhnyi_period.xlsx
Name: 2022_09_25_en_propuskna_spromozhnist_peretyniv_na_kozhnyi_period.xlsx
Format: EN XLSX
Size: 8.65 MB
Count of rows: 353360
Date updated: Sept. 28, 2022, 2:25 p.m.
Name Format Size Count of rows Date updated
2022_09_25_uk_propuskna_spromozhnist_peretyniv_na_kozhnyi_period.csv UK CSV 19.98 MB 353360 Sept. 28, 2022, 2:14 p.m. Download
2022_09_25_uk_propuskna_spromozhnist_peretyniv_na_kozhnyi_period.xlsx UK XLSX 8.17 MB 353360 Sept. 28, 2022, 2:16 p.m. Download
2022_09_25_en_propuskna_spromozhnist_peretyniv_na_kozhnyi_period.csv EN CSV 14.60 MB 353360 Sept. 28, 2022, 2:24 p.m. Download
2022_09_25_en_propuskna_spromozhnist_peretyniv_na_kozhnyi_period.xlsx EN XLSX 8.65 MB 353360 Sept. 28, 2022, 2:25 p.m. Download
Field Name Description
date Date

Date of submission of the information

hour Hour

-

cross_border_direction Direction

Moldova, Poland, Hungary, Slovakia, Romania; Russia, Belarus (up to 24.02.2022).
On February 24, 2022, Ukraine’s energy system was disconnected from the power systems of Russia and Belarus, respectively, commercial electricity export and import from this period is not carried out.

capacity_net Net Transfer Capacity, MW

MW

capacity_available Available Transfer Capability, MW

MW

capacity_allocated Already Allocated Capacity, MW

MW

Field
Name
date
Date
Description

Date of submission of the information

Field
Name
hour
Hour
Description

-

Field
Name
cross_border_direction
Direction
Description

Moldova, Poland, Hungary, Slovakia, Romania; Russia, Belarus (up to 24.02.2022).
On February 24, 2022, Ukraine’s energy system was disconnected from the power systems of Russia and Belarus, respectively, commercial electricity export and import from this period is not carried out.

Field
Name
capacity_net
Net Transfer Capacity, MW
Description

MW

Field
Name
capacity_available
Available Transfer Capability, MW
Description

MW

Field
Name
capacity_allocated
Already Allocated Capacity, MW
Description

MW