Transfer capacity of cross-border electrical networks for each settlement period
Information on the transfer capacity of cross-border electrical networks for each settlement period. In hourly detail, given the information on the net and available transfer capacity of the cross-border networks, as well as the capacity allocated by the outcome of the auctions, with an indication of the direction of distribution.
Field | Name | Description |
---|---|---|
date | Date |
Date of submission of the information |
hour | Hour |
- |
cross_border_direction | Direction |
Moldova, Poland, Hungary, Slovakia, Romania; Russia, Belarus (up to 24.02.2022). |
capacity_net | Net Transfer Capacity, MW |
MW |
capacity_available | Available Transfer Capability, MW |
MW |
capacity_allocated | Already Allocated Capacity, MW |
MW |
Date of submission of the information
-
Moldova, Poland, Hungary, Slovakia, Romania; Russia, Belarus (up to 24.02.2022).
On February 24, 2022, Ukraine’s energy system was disconnected from the power systems of Russia and Belarus, respectively, commercial electricity export and import from this period is not carried out.
MW
MW
MW
Name | Format | Size | Count of rows | Date updated | |
---|---|---|---|---|---|
2022_09_25_uk_propuskna_spromozhnist_peretyniv_na_kozhnyi_period.csv | UK CSV | 19.98 MB | 353360 | Sept. 28, 2022, 2:14 p.m. | Download |
2022_09_25_uk_propuskna_spromozhnist_peretyniv_na_kozhnyi_period.xlsx | UK XLSX | 8.17 MB | 353360 | Sept. 28, 2022, 2:16 p.m. | Download |
2022_09_25_en_propuskna_spromozhnist_peretyniv_na_kozhnyi_period.csv | EN CSV | 14.60 MB | 353360 | Sept. 28, 2022, 2:24 p.m. | Download |
2022_09_25_en_propuskna_spromozhnist_peretyniv_na_kozhnyi_period.xlsx | EN XLSX | 8.65 MB | 353360 | Sept. 28, 2022, 2:25 p.m. | Download |