Information on the hourly power balance of the Integrated Power System (IPS) of Ukraine in terms of generation components: nuclear, cogeneration, renewable, thermal, hydroelectric, pumped storage power plants and volumes of electricity consumption. Electricity production by renewables takes into account the volumes of electricity produced by generating facilities of private households. Power consumption does not include pumping volumes of the PSPP. Interstate flows: EU, Moldova and up to 24.02.2022 Belarus and Russia.

Update date Feb. 13, 2023, 4:45 p.m. Weekly
Coverage period 01.01.2014 - 27.10.2022
Organizations
National Power Company Ukrenergo
Sources
More Show
2022_10_27_uk_pohodynnyi_balans.csv
Name: 2022_10_27_uk_pohodynnyi_balans.csv
Format: UK CSV
Size: 60.56 MB
Count of rows: 857433
Date updated: Feb. 13, 2023, 3:01 p.m.
2022_10_27_uk_pohodynnyi_balans.xlsx
Name: 2022_10_27_uk_pohodynnyi_balans.xlsx
Format: UK XLSX
Size: 20.97 MB
Count of rows: 857433
Date updated: Feb. 13, 2023, 3:11 p.m.
2022_10_27_en_pohodynnyi_balans.csv
Name: 2022_10_27_en_pohodynnyi_balans.csv
Format: EN CSV
Size: 44.70 MB
Count of rows: 857433
Date updated: Feb. 13, 2023, 3:46 p.m.
2022_10_27_en_pohodynnyi_balans.xlsx
Name: 2022_10_27_en_pohodynnyi_balans.xlsx
Format: EN XLSX
Size: 20.31 MB
Count of rows: 857433
Date updated: Feb. 13, 2023, 3:50 p.m.
Name Format Size Count of rows Date updated
2022_10_27_uk_pohodynnyi_balans.csv UK CSV 60.56 MB 857433 Feb. 13, 2023, 3:01 p.m. Download
2022_10_27_uk_pohodynnyi_balans.xlsx UK XLSX 20.97 MB 857433 Feb. 13, 2023, 3:11 p.m. Download
2022_10_27_en_pohodynnyi_balans.csv EN CSV 44.70 MB 857433 Feb. 13, 2023, 3:46 p.m. Download
2022_10_27_en_pohodynnyi_balans.xlsx EN XLSX 20.31 MB 857433 Feb. 13, 2023, 3:50 p.m. Download
Field Name Description
date Date

-

time Hour

-

balance_component Balance component name

• Generation
• Consumption
• Interstate flows

balance_subcomponent Balance subcomponent name

Balance subcomponent that provides information about generators: NPP, TPP, CHP, HPP, PSPP, RES and interstate electricity flows directions : EU, Moldova; Russia and Belarus (up to 24.02.2022).
On February 24, 2022, Ukraine’s energy system was disconnected from the power systems of Russia and Belarus, respectively, electricity flows from this period are not taking place.

amount Electricity amount, MW

MW

Field
Name
date
Date
Description

-

Field
Name
time
Hour
Description

-

Field
Name
balance_component
Balance component name
Description

• Generation
• Consumption
• Interstate flows

Field
Name
balance_subcomponent
Balance subcomponent name
Description

Balance subcomponent that provides information about generators: NPP, TPP, CHP, HPP, PSPP, RES and interstate electricity flows directions : EU, Moldova; Russia and Belarus (up to 24.02.2022).
On February 24, 2022, Ukraine’s energy system was disconnected from the power systems of Russia and Belarus, respectively, electricity flows from this period are not taking place.

Field
Name
amount
Electricity amount, MW
Description

MW