Information on planned renovation work, that may affect the functioning of Ukrainian GTS and led to gas transmission restrictions. Dataset contains information on the company (DSO, industrial consumer, etc), whose activity may be influenced by renovation, GTS facility on which repair work will take place, month of its performance and duration of gas transmission termination.
Update date July 20, 2022, 12:33 p.m. Annually
Coverage period 01.01.2020 - 31.12.2021
Organizations
Gas Transmission System Operator of Ukraine LLC
Sources
More Show
2021_12_31_uk_remontni_roboty_gts.csv
Name: 2021_12_31_uk_remontni_roboty_gts.csv
Format: UK CSV
Size: 674.66 KB
Count of rows: 2046
Date updated: Sept. 16, 2021, 7:52 a.m.
2021_12_31_uk_remontni_roboty_gts.xlsx
Name: 2021_12_31_uk_remontni_roboty_gts.xlsx
Format: UK XLSX
Size: 190.68 KB
Count of rows: 2046
Date updated: Sept. 16, 2021, 7:52 a.m.
2021_12_31_en_remontni_roboty_gts.csv
Name: 2021_12_31_en_remontni_roboty_gts.csv
Format: EN CSV
Size: 522.25 KB
Count of rows: 2046
Date updated: July 20, 2022, 12:33 p.m.
2021_12_31_en_remontni_roboty_gts.xlsx
Name: 2021_12_31_en_remontni_roboty_gts.xlsx
Format: EN XLSX
Size: 160.30 KB
Count of rows: 2046
Date updated: July 20, 2022, 12:33 p.m.
Name Format Size Count of rows Date updated
2021_12_31_uk_remontni_roboty_gts.csv UK CSV 674.66 KB 2046 Sept. 16, 2021, 7:52 a.m. Download
2021_12_31_uk_remontni_roboty_gts.xlsx UK XLSX 190.68 KB 2046 Sept. 16, 2021, 7:52 a.m. Download
2021_12_31_en_remontni_roboty_gts.csv EN CSV 522.25 KB 2046 July 20, 2022, 12:33 p.m. Download
2021_12_31_en_remontni_roboty_gts.xlsx EN XLSX 160.30 KB 2046 July 20, 2022, 12:33 p.m. Download
Field Name Description
period_start Date start

-

period_end Date end

-

company_name Company name

DSO or industrial consumer, which may be affected by repair works

company_code USREOU code

-

region Region

Northern, eastern, central, western

division Structural subdivision

Linear Production Department of the Main Gas Pipelines
Production Department for Underground Gas Storage

gts_facility GTS facility name

Transmission system infrastructure under repair

interconnection_point Entry/exit point name (commercial hub)

-

interconnection_point_type GTS facility type

Entry, exit

natural_gas_waste Maximum daily gas consumption, m3/day

cubic meters per day

repair_work_type Name of the works planned for implementation

-

repair_work_month Planned term of work, months

month

termination_duration Duration of the stop, hours

hours

Field
Name
period_start
Date start
Description

-

Field
Name
period_end
Date end
Description

-

Field
Name
company_name
Company name
Description

DSO or industrial consumer, which may be affected by repair works

Field
Name
company_code
USREOU code
Description

-

Field
Name
region
Region
Description

Northern, eastern, central, western

Field
Name
division
Structural subdivision
Description

Linear Production Department of the Main Gas Pipelines
Production Department for Underground Gas Storage

Field
Name
gts_facility
GTS facility name
Description

Transmission system infrastructure under repair

Field
Name
interconnection_point
Entry/exit point name (commercial hub)
Description

-

Field
Name
interconnection_point_type
GTS facility type
Description

Entry, exit

Field
Name
natural_gas_waste
Maximum daily gas consumption, m3/day
Description

cubic meters per day

Field
Name
repair_work_type
Name of the works planned for implementation
Description

-

Field
Name
repair_work_month
Planned term of work, months
Description

month

Field
Name
termination_duration
Duration of the stop, hours
Description

hours