Planned repair works on Ukrainian GTS that may affect natural gas transmission
Temporary not updated since 24.02.22
Information on planned renovation work, that may affect the functioning of Ukrainian GTS and led to gas transmission restrictions. Dataset contains information on the company (DSO, industrial consumer, etc), whose activity may be influenced by renovation, GTS facility on which repair work will take place, month of its performance and duration of gas transmission termination.
Update date
July 20, 2022, 12:33 p.m.
Annually
Data for period
01.01.2020 - 31.12.2021
Organizations
Gas Transmission System Operator of Ukraine LLC
More
Show
Field | Name | Description |
---|---|---|
period_start | Date start |
- |
period_end | Date end |
- |
company_name | Company name |
DSO or industrial consumer, which may be affected by repair works |
company_code | USREOU code |
- |
region | Region |
Northern, eastern, central, western |
division | Structural subdivision |
Linear Production Department of the Main Gas Pipelines |
gts_facility | GTS facility name |
Transmission system infrastructure under repair |
interconnection_point | Entry/exit point name (commercial hub) |
- |
interconnection_point_type | GTS facility type |
Entry, exit |
natural_gas_waste | Maximum daily gas consumption, m3/day |
cubic meters per day |
repair_work_type | Name of the works planned for implementation |
- |
repair_work_month | Planned term of work, months |
month |
termination_duration | Duration of the stop, hours |
hours |
Field
Name
period_start
Date start
Description
-
Field
Name
period_end
Date end
Description
-
Field
Name
company_name
Company name
Description
DSO or industrial consumer, which may be affected by repair works
Field
Name
company_code
USREOU code
Description
-
Field
Name
region
Region
Description
Northern, eastern, central, western
Field
Name
division
Structural subdivision
Description
Linear Production Department of the Main Gas Pipelines
Production Department for Underground Gas Storage
Field
Name
gts_facility
GTS facility name
Description
Transmission system infrastructure under repair
Field
Name
interconnection_point
Entry/exit point name (commercial hub)
Description
-
Field
Name
interconnection_point_type
GTS facility type
Description
Entry, exit
Field
Name
natural_gas_waste
Maximum daily gas consumption, m3/day
Description
cubic meters per day
Field
Name
repair_work_type
Name of the works planned for implementation
Description
-
Field
Name
repair_work_month
Planned term of work, months
Description
month
Field
Name
termination_duration
Duration of the stop, hours
Description
hours
2021_12_31_uk_remontni_roboty_gts.csv
Name:
2021_12_31_uk_remontni_roboty_gts.csv
Format:
UK
CSV
Size:
674.66 KB
Count of rows:
2046
Date updated:
Sept. 16, 2021, 7:52 a.m.
2021_12_31_uk_remontni_roboty_gts.xlsx
Name:
2021_12_31_uk_remontni_roboty_gts.xlsx
Format:
UK
XLSX
Size:
190.68 KB
Count of rows:
2046
Date updated:
Sept. 16, 2021, 7:52 a.m.
Name | Format | Size | Count of rows | Date updated | |
---|---|---|---|---|---|
2021_12_31_uk_remontni_roboty_gts.csv | UK CSV | 674.66 KB | 2046 | Sept. 16, 2021, 7:52 a.m. | Download |
2021_12_31_uk_remontni_roboty_gts.xlsx | UK XLSX | 190.68 KB | 2046 | Sept. 16, 2021, 7:52 a.m. | Download |
2021_12_31_en_remontni_roboty_gts.csv | EN CSV | 522.25 KB | 2046 | July 20, 2022, 12:33 p.m. | Download |
2021_12_31_en_remontni_roboty_gts.xlsx | EN XLSX | 160.30 KB | 2046 | July 20, 2022, 12:33 p.m. | Download |