Information on the electricity price indexes of the base, peak and off-peak load, which were formed on the Day-Ahead Market (DAM) in Ukraine and in neighbouring countries: Poland, Romania, Slovakia and Hungary.

By February 24, 2022, two separate trade zones "Burshtyn TPP Island" and "Integrated Power System of Ukraine" existed because of the technical features of the Ukrainian energy system. In order to test the stability of the energy system in preparation for integration with ENTSO-E, the 24.02.2022 Ukrainian energy network was disconnected from the networks of all neighbouring countries (except Moldova), and the internal systems were synchronized. Since that moment, there is a single trading zone for the entire energy system of Ukraine.


Starting from December 31, 2024, the Market Operator has ceased publishing data on trades in the DAM and IDM.

Update date Dec. 30, 2024, 4:17 a.m. Daily
Data for period 27.08.2019 - 29.12.2024
Organizations
Market Operator JSC
Sources
More Show
Date Load type Country Price, EUR/MWh Price difference, compared to Ukraine, %
2019-08-27 Base Ukraine 59.08 -
2019-08-27 Base Poland 283.29 379.50
2019-08-27 Base Slovakia 49.01 -17.04
2019-08-27 Base Hungary 85.93 45.45
2019-08-27 Base Romania 85.93 45.45
2019-08-27 Peak Ukraine 73.80 -
2019-08-27 Peak Poland 313.52 324.82
2019-08-27 Peak Slovakia 54.80 -25.75
2019-08-27 Peak Hungary 99.11 34.30
2019-08-27 Peak Romania 99.11 34.30
2019-08-27 OffPeak Ukraine 44.37 -
2019-08-27 OffPeak Poland 253.06 470.34
2019-08-27 OffPeak Slovakia 43.23 -2.57
2019-08-27 OffPeak Hungary 72.74 63.94
2019-08-27 OffPeak Romania 72.74 63.94
Field Name Description
date Date

-

load_type Load type

Base / Peak / OffPeak

country Country

Ukraine, Poland, Romania, Slovakia, Hungary.
On June 11, 2024, the Hungarian market operator HUPX changed its data usage policy, making it impossible to publish DAM electricity prices for Hungary.

price Price, EUR/MWh

Prices in Ukraine are without VAT

price_difference Price difference, compared to Ukraine, %

%

Field
Name
date
Date
Description

-

Field
Name
load_type
Load type
Description

Base / Peak / OffPeak

Field
Name
country
Country
Description

Ukraine, Poland, Romania, Slovakia, Hungary.
On June 11, 2024, the Hungarian market operator HUPX changed its data usage policy, making it impossible to publish DAM electricity prices for Hungary.

Field
Name
price
Price, EUR/MWh
Description

Prices in Ukraine are without VAT

Field
Name
price_difference
Price difference, compared to Ukraine, %
Description

%

2024_12_29_uk_indeksy_rdn_ukraina_susidy.csv
Name: 2024_12_29_uk_indeksy_rdn_ukraina_susidy.csv
Format: UK CSV
Size: 1.47 MB
Count of rows: 29280
Date updated: Dec. 30, 2024, 4:16 a.m.
2024_12_29_uk_indeksy_rdn_ukraina_susidy.xlsx
Name: 2024_12_29_uk_indeksy_rdn_ukraina_susidy.xlsx
Format: UK XLSX
Size: 767.89 KB
Count of rows: 29280
Date updated: Dec. 30, 2024, 4:16 a.m.
2024_12_29_en_indeksy_rdn_ukraina_susidy.csv
Name: 2024_12_29_en_indeksy_rdn_ukraina_susidy.csv
Format: EN CSV
Size: 1.10 MB
Count of rows: 29280
Date updated: Dec. 30, 2024, 4:16 a.m.
2024_12_29_en_indeksy_rdn_ukraina_susidy.xlsx
Name: 2024_12_29_en_indeksy_rdn_ukraina_susidy.xlsx
Format: EN XLSX
Size: 741.06 KB
Count of rows: 29280
Date updated: Dec. 30, 2024, 4:16 a.m.
Name Format Size Count of rows Date updated
2024_12_29_uk_indeksy_rdn_ukraina_susidy.csv UK CSV 1.47 MB 29280 Dec. 30, 2024, 4:16 a.m. Download
2024_12_29_uk_indeksy_rdn_ukraina_susidy.xlsx UK XLSX 767.89 KB 29280 Dec. 30, 2024, 4:16 a.m. Download
2024_12_29_en_indeksy_rdn_ukraina_susidy.csv EN CSV 1.10 MB 29280 Dec. 30, 2024, 4:16 a.m. Download
2024_12_29_en_indeksy_rdn_ukraina_susidy.xlsx EN XLSX 741.06 KB 29280 Dec. 30, 2024, 4:16 a.m. Download