Information on market participants on the intra-day market (IDM) with indication of the size of market share by volume of sale and purchase of electricity.

For the trade zone "IPS of Ukraine" there are 50 largest participants, for the trade zone " Burshtyn TPP Island" – all participants.

Update date Jan. 20, 2023, 6:07 p.m. Monthly
Coverage period 01.07.2019 - 31.01.2022
Organizations
NEURC
Sources
More Show
2022_01_31_uk_chastka_uchasnykiv_vdr.csv
Name: 2022_01_31_uk_chastka_uchasnykiv_vdr.csv
Format: UK CSV
Size: 2.96 MB
Count of rows: 16746
Date updated: Jan. 20, 2023, 6:06 p.m.
2022_01_31_uk_chastka_uchasnykiv_vdr.xlsx
Name: 2022_01_31_uk_chastka_uchasnykiv_vdr.xlsx
Format: UK XLSX
Size: 1.21 MB
Count of rows: 16746
Date updated: Jan. 20, 2023, 6:06 p.m.
2022_01_31_en_chastka_uchasnykiv_vdr.csv
Name: 2022_01_31_en_chastka_uchasnykiv_vdr.csv
Format: EN CSV
Size: 2.32 MB
Count of rows: 16746
Date updated: Jan. 20, 2023, 6:07 p.m.
2022_01_31_en_chastka_uchasnykiv_vdr.xlsx
Name: 2022_01_31_en_chastka_uchasnykiv_vdr.xlsx
Format: EN XLSX
Size: 1.12 MB
Count of rows: 16746
Date updated: Jan. 20, 2023, 6:07 p.m.
Name Format Size Count of rows Date updated
2022_01_31_uk_chastka_uchasnykiv_vdr.csv UK CSV 2.96 MB 16746 Jan. 20, 2023, 6:06 p.m. Download
2022_01_31_uk_chastka_uchasnykiv_vdr.xlsx UK XLSX 1.21 MB 16746 Jan. 20, 2023, 6:06 p.m. Download
2022_01_31_en_chastka_uchasnykiv_vdr.csv EN CSV 2.32 MB 16746 Jan. 20, 2023, 6:07 p.m. Download
2022_01_31_en_chastka_uchasnykiv_vdr.xlsx EN XLSX 1.12 MB 16746 Jan. 20, 2023, 6:07 p.m. Download
Field Name Description
date_start Date start

-

date_end Date end

-

month Month

-

energy_system Trading area

By February 24, 2022, two separate trade zones "Burshtyn TPP Island" and "Integrated Power System of Ukraine" existed because of the technical features of the Ukrainian energy system. In order to test the stability of the energy system in preparation for integration with ENTSO-E, the 24.02.2022 Ukrainian energy network was disconnected from the networks of all neighbouring countries (except Moldova), and the internal systems were synchronized. Since that moment, there is a single trading zone for the entire energy system of Ukraine.

application_type Type of application

Declared / accepted

activity_type Type of activity

Buy / sell

company_code USREOU code

-

company_name Company name

-

share Share of market participants, %

Share of market participants, %

amount Volume, MWh

MWh

Field
Name
date_start
Date start
Description

-

Field
Name
date_end
Date end
Description

-

Field
Name
month
Month
Description

-

Field
Name
energy_system
Trading area
Description

By February 24, 2022, two separate trade zones "Burshtyn TPP Island" and "Integrated Power System of Ukraine" existed because of the technical features of the Ukrainian energy system. In order to test the stability of the energy system in preparation for integration with ENTSO-E, the 24.02.2022 Ukrainian energy network was disconnected from the networks of all neighbouring countries (except Moldova), and the internal systems were synchronized. Since that moment, there is a single trading zone for the entire energy system of Ukraine.

Field
Name
application_type
Type of application
Description

Declared / accepted

Field
Name
activity_type
Type of activity
Description

Buy / sell

Field
Name
company_code
USREOU code
Description

-

Field
Name
company_name
Company name
Description

-

Field
Name
share
Share of market participants, %
Description

Share of market participants, %

Field
Name
amount
Volume, MWh
Description

MWh