Information on nominal capacity, operation status, annual number of operating hours and requirements for large combustion plants (Thermal Power Plants, Combined Heat and Power Plants, and large Boiler Plants) included in the National Emissions Reduction Plan (NERP). There is also information on the destruction of installations as a result of hostilities, as well as the location in temporarily uncontrolled territories.

NERP was approved by the decree of the Cabinet of Ministers of 08.11.2017 № 796-р and is a program document of the Government aimed at gradually reducing emissions of harmful substances into the air, implementing investment projects for the installation of equipment for cleaning exhaust gases and achieving European emission standards by combustion plants in accordance with the Directive 2010/75/EU on industrial emissions.

Update date April 25, 2023, 1:31 p.m. Annually
Coverage period 01.01.2018 - 31.12.2022
Organizations
Ministry of Energy of Ukraine
Sources
More Show
2022_12_31_uk_kharakterystyky_stantsii_npsv.csv
Name: 2022_12_31_uk_kharakterystyky_stantsii_npsv.csv
Format: UK CSV
Size: 268.89 KB
Count of rows: 1205
Date updated: April 25, 2023, 12:39 p.m.
2022_12_31_uk_kharakterystyky_stantsii_npsv.xlsx
Name: 2022_12_31_uk_kharakterystyky_stantsii_npsv.xlsx
Format: UK XLSX
Size: 85.67 KB
Count of rows: 1205
Date updated: April 25, 2023, 12:39 p.m.
2022_12_31_en_kharakterystyky_stantsii_npsv.csv
Name: 2022_12_31_en_kharakterystyky_stantsii_npsv.csv
Format: EN CSV
Size: 227.59 KB
Count of rows: 1205
Date updated: April 25, 2023, 12:40 p.m.
2022_12_31_en_kharakterystyky_stantsii_npsv.xlsx
Name: 2022_12_31_en_kharakterystyky_stantsii_npsv.xlsx
Format: EN XLSX
Size: 76.40 KB
Count of rows: 1205
Date updated: April 25, 2023, 12:40 p.m.
Name Format Size Count of rows Date updated
2022_12_31_uk_kharakterystyky_stantsii_npsv.csv UK CSV 268.89 KB 1205 April 25, 2023, 12:39 p.m. Download
2022_12_31_uk_kharakterystyky_stantsii_npsv.xlsx UK XLSX 85.67 KB 1205 April 25, 2023, 12:39 p.m. Download
2022_12_31_en_kharakterystyky_stantsii_npsv.csv EN CSV 227.59 KB 1205 April 25, 2023, 12:40 p.m. Download
2022_12_31_en_kharakterystyky_stantsii_npsv.xlsx EN XLSX 76.40 KB 1205 April 25, 2023, 12:40 p.m. Download
Field Name Description
date_start Date start

-

date_end Date end

-

year Year

-

company_code USREOU company code

-

company_name Company name

-

unit_id Unit ID

-

unit_type Unit type

• power-generating unit
• boiler plant
• PTVM-100 (Oil/Gas Fired Boilers)
• VK (Water Heater)
• GPA-25S, GPA-C-16, GTK-25I, GTN-16, GPU-16 (Gas Pumping Units)

unit_number Unit number

-

unit_status Unit operation status

• work
• does not work
• replacement of equipment
• decommissioned
• damaged as a result of hostilities
• possibly destroyed
• unknown

capacity_installed Nominal thermal capacity of the unit, MW

MW

operation_time Number of unit operation hours, h/year

hours/year

requirement Established installation requirement according to NERP

• emission reduction
• limitation of working time – 20 / 40 thousand hours
• decommissioning is planned after 40 thousand hours of work
• replacement of the equipment in accordance with the requirements of the Directive 2010/75/EU
• is not established

note Note

-

Field
Name
date_start
Date start
Description

-

Field
Name
date_end
Date end
Description

-

Field
Name
year
Year
Description

-

Field
Name
company_code
USREOU company code
Description

-

Field
Name
company_name
Company name
Description

-

Field
Name
unit_id
Unit ID
Description

-

Field
Name
unit_type
Unit type
Description

• power-generating unit
• boiler plant
• PTVM-100 (Oil/Gas Fired Boilers)
• VK (Water Heater)
• GPA-25S, GPA-C-16, GTK-25I, GTN-16, GPU-16 (Gas Pumping Units)

Field
Name
unit_number
Unit number
Description

-

Field
Name
unit_status
Unit operation status
Description

• work
• does not work
• replacement of equipment
• decommissioned
• damaged as a result of hostilities
• possibly destroyed
• unknown

Field
Name
capacity_installed
Nominal thermal capacity of the unit, MW
Description

MW

Field
Name
operation_time
Number of unit operation hours, h/year
Description

hours/year

Field
Name
requirement
Established installation requirement according to NERP
Description

• emission reduction
• limitation of working time – 20 / 40 thousand hours
• decommissioning is planned after 40 thousand hours of work
• replacement of the equipment in accordance with the requirements of the Directive 2010/75/EU
• is not established

Field
Name
note
Note
Description

-