Information on the results of monthly capacity allocation auctions at the interconnection points of the Ukrainian gas transportation system (GTS). The data is broken down by interconnection points, and includes information on the type of capacity, the amount of free capacity and the total capacity distributed within the auction. The starting and final price of capacities allocation is also mentioned.
Update date April 11, 2024, 1:54 p.m. Monthly
Coverage period 01.10.2020 - 01.05.2024
Organizations
Gas Transmission System Operator of Ukraine LLC
Sources
More Show
2024_05_01_uk_rozpodil_misiachnykh_potuzhnostei_hts.xlsx
Name: 2024_05_01_uk_rozpodil_misiachnykh_potuzhnostei_hts.xlsx
Format: UK XLSX
Size: 21.51 KB
Count of rows: 221
Date updated: April 11, 2024, 1:54 p.m.
2024_05_01_en_rozpodil_misiachnykh_potuzhnostei_hts.csv
Name: 2024_05_01_en_rozpodil_misiachnykh_potuzhnostei_hts.csv
Format: EN CSV
Size: 31.47 KB
Count of rows: 221
Date updated: April 11, 2024, 1:54 p.m.
2024_05_01_en_rozpodil_misiachnykh_potuzhnostei_hts.xlsx
Name: 2024_05_01_en_rozpodil_misiachnykh_potuzhnostei_hts.xlsx
Format: EN XLSX
Size: 19.88 KB
Count of rows: 221
Date updated: April 11, 2024, 1:54 p.m.
2024_05_01_uk_rozpodil_misiachnykh_potuzhnostei_hts.csv
Name: 2024_05_01_uk_rozpodil_misiachnykh_potuzhnostei_hts.csv
Format: UK CSV
Size: 42.91 KB
Count of rows: 221
Date updated: April 11, 2024, 1:54 p.m.
Name Format Size Count of rows Date updated
2024_05_01_uk_rozpodil_misiachnykh_potuzhnostei_hts.xlsx UK XLSX 21.51 KB 221 April 11, 2024, 1:54 p.m. Download
2024_05_01_en_rozpodil_misiachnykh_potuzhnostei_hts.csv EN CSV 31.47 KB 221 April 11, 2024, 1:54 p.m. Download
2024_05_01_en_rozpodil_misiachnykh_potuzhnostei_hts.xlsx EN XLSX 19.88 KB 221 April 11, 2024, 1:54 p.m. Download
2024_05_01_uk_rozpodil_misiachnykh_potuzhnostei_hts.csv UK CSV 42.91 KB 221 April 11, 2024, 1:54 p.m. Download
Field Name Description
auction_number Auction number

-

interconnection_point Interconnection point of the GTS

-

country Country

-

eic Energy identification code (EIC)

-

interconnection_point_type Type of interconnection point of the GTS

Enter / exit

capacity_type Type of capacity

Firm unbundled / interruptible unbundled

period_date_start Start date

The date, starting from which the capacity is allocated

time_start Start time

The hour, starting from which the capacity is allocated (7 standing for 7 a.m.)

period_date_end End date

The date, til which the capacity is allocated

time_end End time

The hour, til which the capacity is allocated (7 standing for 7 a.m.)

capacity_free Free capacity, m3/day

cubic meters per day

price_start Starting price of auction, USD

USD

capacity_allocated Allocated capacity, m3/day

cubic meters per day

price_final Final price, USD

USD

Field
Name
auction_number
Auction number
Description

-

Field
Name
interconnection_point
Interconnection point of the GTS
Description

-

Field
Name
country
Country
Description

-

Field
Name
eic
Energy identification code (EIC)
Description

-

Field
Name
interconnection_point_type
Type of interconnection point of the GTS
Description

Enter / exit

Field
Name
capacity_type
Type of capacity
Description

Firm unbundled / interruptible unbundled

Field
Name
period_date_start
Start date
Description

The date, starting from which the capacity is allocated

Field
Name
time_start
Start time
Description

The hour, starting from which the capacity is allocated (7 standing for 7 a.m.)

Field
Name
period_date_end
End date
Description

The date, til which the capacity is allocated

Field
Name
time_end
End time
Description

The hour, til which the capacity is allocated (7 standing for 7 a.m.)

Field
Name
capacity_free
Free capacity, m3/day
Description

cubic meters per day

Field
Name
price_start
Starting price of auction, USD
Description

USD

Field
Name
capacity_allocated
Allocated capacity, m3/day
Description

cubic meters per day

Field
Name
price_final
Final price, USD
Description

USD