Information on the number of standard and non-standard connections and the amount of the connected capacity as a result of the provision of connection services by licensees for the distribution and transmission of electricity.
Update date Oct. 12, 2021, 10:47 a.m. Annually
Coverage period 01.01.2014 - 31.12.2020
Organizations
NEURC
Sources
More Show
2020_12_31_uk_pryiednannia_elektroustanovok_do_merezhi.csv
Name: 2020_12_31_uk_pryiednannia_elektroustanovok_do_merezhi.csv
Format: UK CSV
Size: 52.46 KB
Count of rows: 436
Date updated: Oct. 12, 2021, 10:41 a.m.
2020_12_31_uk_pryiednannia_elektroustanovok_do_merezhi.xlsx
Name: 2020_12_31_uk_pryiednannia_elektroustanovok_do_merezhi.xlsx
Format: UK XLSX
Size: 23.55 KB
Count of rows: 436
Date updated: Oct. 12, 2021, 10:41 a.m.
2020_12_31_en_pryiednannia_elektroustanovok_do_merezhi.csv
Name: 2020_12_31_en_pryiednannia_elektroustanovok_do_merezhi.csv
Format: EN CSV
Size: 38.63 KB
Count of rows: 436
Date updated: Oct. 12, 2021, 10:42 a.m.
2020_12_31_en_pryiednannia_elektroustanovok_do_merezhi.xlsx
Name: 2020_12_31_en_pryiednannia_elektroustanovok_do_merezhi.xlsx
Format: EN XLSX
Size: 21.75 KB
Count of rows: 436
Date updated: Oct. 12, 2021, 10:42 a.m.
Name Format Size Count of rows Date updated
2020_12_31_uk_pryiednannia_elektroustanovok_do_merezhi.csv UK CSV 52.46 KB 436 Oct. 12, 2021, 10:41 a.m. Download
2020_12_31_uk_pryiednannia_elektroustanovok_do_merezhi.xlsx UK XLSX 23.55 KB 436 Oct. 12, 2021, 10:41 a.m. Download
2020_12_31_en_pryiednannia_elektroustanovok_do_merezhi.csv EN CSV 38.63 KB 436 Oct. 12, 2021, 10:42 a.m. Download
2020_12_31_en_pryiednannia_elektroustanovok_do_merezhi.xlsx EN XLSX 21.75 KB 436 Oct. 12, 2021, 10:42 a.m. Download
Field Name Description
date_start Date start

-

date_end Date end

-

year Year

-

company_name Company name

-

company_code USREOU code

Unified state register of enterprises and organizations of Ukraine (USREOU) code

connection_type Electric networks connections type

For a standard connection, 2 conditions must be met:
• the distance from the existing power grids to the point of connection of the electrical installation (house or other object) should not exceed 300 m in a straight line;
• the connection power should not exceed 50 kW.
If one of the conditions is not met - joining is considered non-standard.

number Electric networks connections number

units

capacity_connected Electric networks connected capacity

kW

Field
Name
date_start
Date start
Description

-

Field
Name
date_end
Date end
Description

-

Field
Name
year
Year
Description

-

Field
Name
company_name
Company name
Description

-

Field
Name
company_code
USREOU code
Description

Unified state register of enterprises and organizations of Ukraine (USREOU) code

Field
Name
connection_type
Electric networks connections type
Description

For a standard connection, 2 conditions must be met:
• the distance from the existing power grids to the point of connection of the electrical installation (house or other object) should not exceed 300 m in a straight line;
• the connection power should not exceed 50 kW.
If one of the conditions is not met - joining is considered non-standard.

Field
Name
number
Electric networks connections number
Description

units

Field
Name
capacity_connected
Electric networks connected capacity
Description

kW