Archived information regarding transmission tariffs for domestic interconnection points (prior to 2019) itemized by DSOs to which natural gas is transported. Besides, weighted average transmission tariff and tariff for direct consumers is mentioned. Resource contains references to resolution of the NEURC by which the tariff is imposed.
Update date Sept. 16, 2021, 1:09 p.m. Archive
Data for period 01.06.2014 - 01.01.2019
Organizations
NEURC
Sources
More Show
Field Name Description
tariff_date Date of coming into force of tariffs

-

resolution_number Resolution number

Number of NEURC resolution, by which the tariff for domestic points is imposed

resolution_date Resolution date

Date of adopting NEURC resolution, by which the tariff for domestic points is imposed

resolution_link Link on the resolution

-

tariff_name Type of tariff

• Transmission tariffs for natural gas transported to DSOs
• Weighted average transmission tariff
• Transmission tariff for direct consumers

company_name DSO, to which the gas is transported by trunk pipelines

-

company_code USREOU code of DSO

-

tariff_without_vat Tariff for natural gas transmission by trunk pipelines

UAH per thousand cubic meter per day not including VAT

notes Notes

-

Field
Name
tariff_date
Date of coming into force of tariffs
Description

-

Field
Name
resolution_number
Resolution number
Description

Number of NEURC resolution, by which the tariff for domestic points is imposed

Field
Name
resolution_date
Resolution date
Description

Date of adopting NEURC resolution, by which the tariff for domestic points is imposed

Field
Name
resolution_link
Link on the resolution
Description

-

Field
Name
tariff_name
Type of tariff
Description

• Transmission tariffs for natural gas transported to DSOs
• Weighted average transmission tariff
• Transmission tariff for direct consumers

Field
Name
company_name
DSO, to which the gas is transported by trunk pipelines
Description

-

Field
Name
company_code
USREOU code of DSO
Description

-

Field
Name
tariff_without_vat
Tariff for natural gas transmission by trunk pipelines
Description

UAH per thousand cubic meter per day not including VAT

Field
Name
notes
Notes
Description

-

2019_01_01_uk_taryfy_transportuvannia_hazu_vnutrishni_tochky_2014_2019.csv
Name: 2019_01_01_uk_taryfy_transportuvannia_hazu_vnutrishni_tochky_2014_2019.csv
Format: UK CSV
Size: 136.94 KB
Count of rows: 316
Date updated: Sept. 16, 2021, 1:03 p.m.
2019_01_01_uk_taryfy_transportuvannia_hazu_vnutrishni_tochky_2014_2019.xlsx
Name: 2019_01_01_uk_taryfy_transportuvannia_hazu_vnutrishni_tochky_2014_2019.xlsx
Format: UK XLSX
Size: 28.12 KB
Count of rows: 316
Date updated: Sept. 16, 2021, 1:03 p.m.
2019_01_01_en_taryfy_transportuvannia_hazu_vnutrishni_tochky_2014_2019.csv
Name: 2019_01_01_en_taryfy_transportuvannia_hazu_vnutrishni_tochky_2014_2019.csv
Format: EN CSV
Size: 56.61 KB
Count of rows: 316
Date updated: Sept. 16, 2021, 1:03 p.m.
2019_01_01_en_taryfy_transportuvannia_hazu_vnutrishni_tochky_2014_2019.xlsx
Name: 2019_01_01_en_taryfy_transportuvannia_hazu_vnutrishni_tochky_2014_2019.xlsx
Format: EN XLSX
Size: 18.38 KB
Count of rows: 316
Date updated: Sept. 16, 2021, 1:04 p.m.
Name Format Size Count of rows Date updated
2019_01_01_uk_taryfy_transportuvannia_hazu_vnutrishni_tochky_2014_2019.csv UK CSV 136.94 KB 316 Sept. 16, 2021, 1:03 p.m. Download
2019_01_01_uk_taryfy_transportuvannia_hazu_vnutrishni_tochky_2014_2019.xlsx UK XLSX 28.12 KB 316 Sept. 16, 2021, 1:03 p.m. Download
2019_01_01_en_taryfy_transportuvannia_hazu_vnutrishni_tochky_2014_2019.csv EN CSV 56.61 KB 316 Sept. 16, 2021, 1:03 p.m. Download
2019_01_01_en_taryfy_transportuvannia_hazu_vnutrishni_tochky_2014_2019.xlsx EN XLSX 18.38 KB 316 Sept. 16, 2021, 1:04 p.m. Download