Information on service life and length of overhead power transmission lines on the routs and chains with 35-880 kV voltage indicates power systems related to overhead power transmission lines.

Update date Sept. 27, 2021, 5:48 p.m. Annually
Data for period 01.01.2015 - 31.12.2019
Organizations
National Power Company Ukrenergo
Sources
More Show
Field Name Description
date_start Date start

-

date_end Date end

-

year Year

-

energy_subsystem Power system name

• Dniprovska (Dnipropetrovsk, Zaporizhia, Kirovohrad)
• Donbaska (Donetsk, Luhansk)
• Western (Volyn, Zakarpattia, Ivano-Frankivsk, Lviv, Rivne)
• Southern (Mykolaiv, Odesa, Kherson)
• Southwestern (Vinnytsia, Ternopil, Khmelnytskyi, Chernivtsi)
• Northern (Poltava, Sumy, Kharkiv)
• Central (Zhytomyr, Kyiv, Cherkasy, Chernihiv, Kyiv city)

calculation_method Length calculation method

Length calculation method: by route / by links

line_lifetime Transmission line lifetime

years

line_length Transmission line length

km

Field
Name
date_start
Date start
Description

-

Field
Name
date_end
Date end
Description

-

Field
Name
year
Year
Description

-

Field
Name
energy_subsystem
Power system name
Description

• Dniprovska (Dnipropetrovsk, Zaporizhia, Kirovohrad)
• Donbaska (Donetsk, Luhansk)
• Western (Volyn, Zakarpattia, Ivano-Frankivsk, Lviv, Rivne)
• Southern (Mykolaiv, Odesa, Kherson)
• Southwestern (Vinnytsia, Ternopil, Khmelnytskyi, Chernivtsi)
• Northern (Poltava, Sumy, Kharkiv)
• Central (Zhytomyr, Kyiv, Cherkasy, Chernihiv, Kyiv city)

Field
Name
calculation_method
Length calculation method
Description

Length calculation method: by route / by links

Field
Name
line_lifetime
Transmission line lifetime
Description

years

Field
Name
line_length
Transmission line length
Description

km

2019_12_31_uk_dovzhyna_ekspluat_elektrolinii_enerhosystemy.csv
Name: 2019_12_31_uk_dovzhyna_ekspluat_elektrolinii_enerhosystemy.csv
Format: UK CSV
Size: 16.76 KB
Count of rows: 200
Date updated: Sept. 27, 2021, 5:45 p.m.
2019_12_31_uk_dovzhyna_ekspluat_elektrolinii_enerhosystemy.xlsx
Name: 2019_12_31_uk_dovzhyna_ekspluat_elektrolinii_enerhosystemy.xlsx
Format: UK XLSX
Size: 11.48 KB
Count of rows: 200
Date updated: Sept. 27, 2021, 5:45 p.m.
2019_12_31_en_dovzhyna_ekspluat_elektrolinii_enerhosystemy.csv
Name: 2019_12_31_en_dovzhyna_ekspluat_elektrolinii_enerhosystemy.csv
Format: EN CSV
Size: 12.30 KB
Count of rows: 200
Date updated: Sept. 27, 2021, 5:47 p.m.
2019_12_31_en_dovzhyna_ekspluat_elektrolinii_enerhosystemy.xlsx
Name: 2019_12_31_en_dovzhyna_ekspluat_elektrolinii_enerhosystemy.xlsx
Format: EN XLSX
Size: 11.19 KB
Count of rows: 200
Date updated: Sept. 27, 2021, 5:47 p.m.
Name Format Size Count of rows Date updated
2019_12_31_uk_dovzhyna_ekspluat_elektrolinii_enerhosystemy.csv UK CSV 16.76 KB 200 Sept. 27, 2021, 5:45 p.m. Download
2019_12_31_uk_dovzhyna_ekspluat_elektrolinii_enerhosystemy.xlsx UK XLSX 11.48 KB 200 Sept. 27, 2021, 5:45 p.m. Download
2019_12_31_en_dovzhyna_ekspluat_elektrolinii_enerhosystemy.csv EN CSV 12.30 KB 200 Sept. 27, 2021, 5:47 p.m. Download
2019_12_31_en_dovzhyna_ekspluat_elektrolinii_enerhosystemy.xlsx EN XLSX 11.19 KB 200 Sept. 27, 2021, 5:47 p.m. Download