NPP units repair duration
Temporary not updated since 24.02.22
Information on the planned and actual duration of current, medium and major repairs and the reserve shutdown of nuclear power plants (NPPs). Information is presented by type of repair for specific power units, indicating the date on which the shutdown of the power unit began and ended for repair or reserve purposes, as well as the number of days during which the repair or reserve lasted.
Update date
Jan. 28, 2022, 10:52 a.m.
Quarterly
Data for period
07.11.2017 - 31.12.2021
Organizations
Ministry of Energy of Ukraine
More
Show
Field | Name | Description |
---|---|---|
date_start | Actual repair start date |
- |
date_end | Actual (forecast) repair end date |
- |
power_plant_name | Nuclear power station name |
• ZNPP - Zaporizhzhia NPP (Nuclear Power Plant) |
unit_number | NPP unit number |
- |
repair_type | Repair type |
Current / medium / major |
repair_duration | Actual (forecast) repair duration, days |
days |
Field
Name
date_start
Actual repair start date
Description
-
Field
Name
date_end
Actual (forecast) repair end date
Description
-
Field
Name
power_plant_name
Nuclear power station name
Description
• ZNPP - Zaporizhzhia NPP (Nuclear Power Plant)
• RNPP - Rivne NPP
• KhNPP - Khmelnytskyi NPP
• SUNPP - South-Ukraine NPP
Field
Name
unit_number
NPP unit number
Description
-
Field
Name
repair_type
Repair type
Description
Current / medium / major
Field
Name
repair_duration
Actual (forecast) repair duration, days
Description
days
2021_12_31_uk_tryvalist_remontu_aes.csv
Name:
2021_12_31_uk_tryvalist_remontu_aes.csv
Format:
UK
CSV
Size:
5.79 KB
Count of rows:
99
Date updated:
Jan. 28, 2022, 10:51 a.m.
2021_12_31_uk_tryvalist_remontu_aes.xlsx
Name:
2021_12_31_uk_tryvalist_remontu_aes.xlsx
Format:
UK
XLSX
Size:
8.46 KB
Count of rows:
99
Date updated:
Jan. 28, 2022, 10:51 a.m.
Name | Format | Size | Count of rows | Date updated | |
---|---|---|---|---|---|
2021_12_31_uk_tryvalist_remontu_aes.csv | UK CSV | 5.79 KB | 99 | Jan. 28, 2022, 10:51 a.m. | Download |
2021_12_31_uk_tryvalist_remontu_aes.xlsx | UK XLSX | 8.46 KB | 99 | Jan. 28, 2022, 10:51 a.m. | Download |
2021_12_31_en_tryvalist_remontu_aes.csv | EN CSV | 4.34 KB | 99 | Jan. 28, 2022, 10:51 a.m. | Download |
2021_12_31_en_tryvalist_remontu_aes.xlsx | EN XLSX | 8.21 KB | 99 | Jan. 28, 2022, 10:51 a.m. | Download |