Information on price caps for electricity in bids on the intra-day market (IDM) for each settlement period of the corresponding delivery day. The file specifies both the maximum price limit (price cap) and the minimum price limit (price floor).

Update date Dec. 17, 2024, 8:23 p.m. Monthly
Data for period 01.07.2019 - 31.12.2024
Organizations
NEURC
Sources
Collection methodologies
More Show
Field Name Description
date Day of supply

Date of submission of the information

hour Hour

-

energy_system Trade zone

By February 24, 2022, two separate trade zones "Burshtyn energy island" and "Integrated Power System of Ukraine" existed because of the technical features of the Ukrainian energy system. In order to test the stability of the energy system in preparation for integration with ENTSO-E, the 24.02.2022 Ukrainian energy network was disconnected from the networks of all neighbouring countries and the internal systems were synchronized. Since that moment, there is a single trading zone for the entire energy system of Ukraine (specified as "IPS of Ukraine (synchronized with ENTSO-E systems)").

price_min Lower price limit, UAH/Mwh

Price floor, UAH/MWh (without VAT)

price_max Upper price limit, UAH/Mwh

Price cap, UAH/MWh (without VAT)

Field
Name
date
Day of supply
Description

Date of submission of the information

Field
Name
hour
Hour
Description

-

Field
Name
energy_system
Trade zone
Description

By February 24, 2022, two separate trade zones "Burshtyn energy island" and "Integrated Power System of Ukraine" existed because of the technical features of the Ukrainian energy system. In order to test the stability of the energy system in preparation for integration with ENTSO-E, the 24.02.2022 Ukrainian energy network was disconnected from the networks of all neighbouring countries and the internal systems were synchronized. Since that moment, there is a single trading zone for the entire energy system of Ukraine (specified as "IPS of Ukraine (synchronized with ENTSO-E systems)").

Field
Name
price_min
Lower price limit, UAH/Mwh
Description

Price floor, UAH/MWh (without VAT)

Field
Name
price_max
Upper price limit, UAH/Mwh
Description

Price cap, UAH/MWh (without VAT)

2024_12_31_uk_granychni_tsiny_vdr.csv
Name: 2024_12_31_uk_granychni_tsiny_vdr.csv
Format: UK CSV
Size: 4.81 MB
Count of rows: 71522
Date updated: Dec. 17, 2024, 8:20 p.m.
2024_12_31_uk_granychni_tsiny_vdr.xlsx
Name: 2024_12_31_uk_granychni_tsiny_vdr.xlsx
Format: UK XLSX
Size: 1.45 MB
Count of rows: 71522
Date updated: Dec. 17, 2024, 8:21 p.m.
2024_12_31_en_granychni_tsiny_vdr.csv
Name: 2024_12_31_en_granychni_tsiny_vdr.csv
Format: EN CSV
Size: 4.04 MB
Count of rows: 71522
Date updated: Dec. 17, 2024, 8:22 p.m.
2024_12_31_en_granychni_tsiny_vdr.xlsx
Name: 2024_12_31_en_granychni_tsiny_vdr.xlsx
Format: EN XLSX
Size: 1.43 MB
Count of rows: 71522
Date updated: Dec. 17, 2024, 8:22 p.m.
Name Format Size Count of rows Date updated
2024_12_31_uk_granychni_tsiny_vdr.csv UK CSV 4.81 MB 71522 Dec. 17, 2024, 8:20 p.m. Download
2024_12_31_uk_granychni_tsiny_vdr.xlsx UK XLSX 1.45 MB 71522 Dec. 17, 2024, 8:21 p.m. Download
2024_12_31_en_granychni_tsiny_vdr.csv EN CSV 4.04 MB 71522 Dec. 17, 2024, 8:22 p.m. Download
2024_12_31_en_granychni_tsiny_vdr.xlsx EN XLSX 1.43 MB 71522 Dec. 17, 2024, 8:22 p.m. Download