Information on the events that led to the reduction of the electrical production capacity or the shutdown of the power units of the nuclear power plant, indicating the name and number of the power unit, the date and the short description of the event, as well as the amount of the underproduced electricity. All events are classified according to the International Nuclear Event Scale (INES).
Update date Feb. 2, 2022, 4:55 p.m. Monthly
Data for period 04.03.2018 - 31.12.2021
Organizations
Ministry of Energy of Ukraine
Sources
More Show
Field Name Description
date Date

-

power_plant_name NPP name

-

unit_number NPP unit number

-

nuclear_event_rate Violation level

Level of violation on the INES scale:
0 - Level 0. Event with a deviation below the scale. There is no significance from the point of view of safety;
1 - Level 1. Anomal situation. A situation that goes beyond what is permissible in operation. There are no consequences for the population and the environment.

nuclear_event_impact Violation influence

Influence of violations in NPP operation on the mode of operation of power units

nuclear_event_protection Triggering of automatic protection

Triggering of automatic protection in case of NPP malfunctions

amount Underproduction of electricity, million kWh

million kWh

nuclear_event_description Nuclear event description

-

Field
Name
date
Date
Description

-

Field
Name
power_plant_name
NPP name
Description

-

Field
Name
unit_number
NPP unit number
Description

-

Field
Name
nuclear_event_rate
Violation level
Description

Level of violation on the INES scale:
0 - Level 0. Event with a deviation below the scale. There is no significance from the point of view of safety;
1 - Level 1. Anomal situation. A situation that goes beyond what is permissible in operation. There are no consequences for the population and the environment.

Field
Name
nuclear_event_impact
Violation influence
Description

Influence of violations in NPP operation on the mode of operation of power units

Field
Name
nuclear_event_protection
Triggering of automatic protection
Description

Triggering of automatic protection in case of NPP malfunctions

Field
Name
amount
Underproduction of electricity, million kWh
Description

million kWh

Field
Name
nuclear_event_description
Nuclear event description
Description

-

2021_12_31_uk_porushennia_roboty_aes.csv
Name: 2021_12_31_uk_porushennia_roboty_aes.csv
Format: UK CSV
Size: 23.71 KB
Count of rows: 59
Date updated: Feb. 2, 2022, 4:16 p.m.
2021_12_31_uk_porushennia_roboty_aes.xlsx
Name: 2021_12_31_uk_porushennia_roboty_aes.xlsx
Format: UK XLSX
Size: 13.65 KB
Count of rows: 59
Date updated: Feb. 2, 2022, 4:16 p.m.
2021_12_31_en_porushennia_roboty_aes.csv
Name: 2021_12_31_en_porushennia_roboty_aes.csv
Format: EN CSV
Size: 14.56 KB
Count of rows: 59
Date updated: Feb. 2, 2022, 4:16 p.m.
2021_12_31_en_porushennia_roboty_aes.xlsx
Name: 2021_12_31_en_porushennia_roboty_aes.xlsx
Format: EN XLSX
Size: 11.25 KB
Count of rows: 59
Date updated: Feb. 2, 2022, 4:16 p.m.
Name Format Size Count of rows Date updated
2021_12_31_uk_porushennia_roboty_aes.csv UK CSV 23.71 KB 59 Feb. 2, 2022, 4:16 p.m. Download
2021_12_31_uk_porushennia_roboty_aes.xlsx UK XLSX 13.65 KB 59 Feb. 2, 2022, 4:16 p.m. Download
2021_12_31_en_porushennia_roboty_aes.csv EN CSV 14.56 KB 59 Feb. 2, 2022, 4:16 p.m. Download
2021_12_31_en_porushennia_roboty_aes.xlsx EN XLSX 11.25 KB 59 Feb. 2, 2022, 4:16 p.m. Download