Violation of NPP units operation
Temporary not updated since 24.02.22
Field | Name | Description |
---|---|---|
date | Date |
- |
power_plant_name | NPP name |
- |
unit_number | NPP unit number |
- |
nuclear_event_rate | Violation level |
Level of violation on the INES scale: |
nuclear_event_impact | Violation influence |
Influence of violations in NPP operation on the mode of operation of power units |
nuclear_event_protection | Triggering of automatic protection |
Triggering of automatic protection in case of NPP malfunctions |
amount | Underproduction of electricity, million kWh |
million kWh |
nuclear_event_description | Nuclear event description |
- |
-
-
-
Level of violation on the INES scale:
0 - Level 0. Event with a deviation below the scale. There is no significance from the point of view of safety;
1 - Level 1. Anomal situation. A situation that goes beyond what is permissible in operation. There are no consequences for the population and the environment.
Influence of violations in NPP operation on the mode of operation of power units
Triggering of automatic protection in case of NPP malfunctions
million kWh
-
Name | Format | Size | Count of rows | Date updated | |
---|---|---|---|---|---|
2021_12_31_uk_porushennia_roboty_aes.csv | UK CSV | 23.71 KB | 59 | Feb. 2, 2022, 4:16 p.m. | Download |
2021_12_31_uk_porushennia_roboty_aes.xlsx | UK XLSX | 13.65 KB | 59 | Feb. 2, 2022, 4:16 p.m. | Download |
2021_12_31_en_porushennia_roboty_aes.csv | EN CSV | 14.56 KB | 59 | Feb. 2, 2022, 4:16 p.m. | Download |
2021_12_31_en_porushennia_roboty_aes.xlsx | EN XLSX | 11.25 KB | 59 | Feb. 2, 2022, 4:16 p.m. | Download |