Information on actual emissions of dust, sulphur dioxide and nitrogen oxides by large combustion plants (Thermal Power Plants, Combined Heat and Power Plants, and large Boiler Plants) included in the National Emissions Reduction Plan (NERP). Information on the exchange of emissions volumes between plant operators and the deviation of the actual emissions from the ones planned according to the NERP is also indicated.

NERP was approved by the decree of the Cabinet of Ministers of 08.11.2017 № 796-р and is a program document of the Government aimed at gradually reducing emissions of harmful substances into the air, implementing investment projects for the installation of equipment for cleaning exhaust gases and achieving European emission standards by combustion plants in accordance with the Directive 2010/75/EU on industrial emissions.

Update date April 25, 2023, 10:21 a.m. Annually
Data for period 01.01.2018 - 31.12.2022
Organizations
Ministry of Energy of Ukraine
Sources
More Show
Field Name Description
date_start Date start

-

date_end Date end

-

year Year

-

company_code USREOU company code

-

company_name Company name

-

unit_id Unit ID

-

unit_type Unit type

• power-generating unit
• boiler plant
• PTVM-100 (Oil/Gas Fired Boilers)
• VK (Water Heater)
• GPA-25S, GPA-C-16, GTK-25I, GTN-16, GPU-16 (Gas Pumping Units)

unit_number Unit number

-

pollutant_type Pollutant type

Dust, sulfur dioxide, nitrogen oxides

emissions_before_exchange Actual emissions, tons

tons/year

emissions_exchange Exchange of emissions between operators, tons

tons/year

emissions_after_exchange Actual emissions after exchange, tons

tons/year

emissions_planned Annual emission requirements, tons/

tons/year

deviation_tons Deviation of actual from planned emissions, tons

tons

deviation_perc Deviation of actual from planned emissions, %

%

Field
Name
date_start
Date start
Description

-

Field
Name
date_end
Date end
Description

-

Field
Name
year
Year
Description

-

Field
Name
company_code
USREOU company code
Description

-

Field
Name
company_name
Company name
Description

-

Field
Name
unit_id
Unit ID
Description

-

Field
Name
unit_type
Unit type
Description

• power-generating unit
• boiler plant
• PTVM-100 (Oil/Gas Fired Boilers)
• VK (Water Heater)
• GPA-25S, GPA-C-16, GTK-25I, GTN-16, GPU-16 (Gas Pumping Units)

Field
Name
unit_number
Unit number
Description

-

Field
Name
pollutant_type
Pollutant type
Description

Dust, sulfur dioxide, nitrogen oxides

Field
Name
emissions_before_exchange
Actual emissions, tons
Description

tons/year

Field
Name
emissions_exchange
Exchange of emissions between operators, tons
Description

tons/year

Field
Name
emissions_after_exchange
Actual emissions after exchange, tons
Description

tons/year

Field
Name
emissions_planned
Annual emission requirements, tons/
Description

tons/year

Field
Name
deviation_tons
Deviation of actual from planned emissions, tons
Description

tons

Field
Name
deviation_perc
Deviation of actual from planned emissions, %
Description

%

2022_12_31_uk_vykydy_stantsii_npsv.csv
Name: 2022_12_31_uk_vykydy_stantsii_npsv.csv
Format: UK CSV
Size: 745.95 KB
Count of rows: 5662
Date updated: April 25, 2023, 10:07 a.m.
2022_12_31_uk_vykydy_stantsii_npsv.xlsx
Name: 2022_12_31_uk_vykydy_stantsii_npsv.xlsx
Format: UK XLSX
Size: 270.27 KB
Count of rows: 5662
Date updated: April 25, 2023, 10:07 a.m.
2022_12_31_en_vykydy_stantsii_npsv.csv
Name: 2022_12_31_en_vykydy_stantsii_npsv.csv
Format: EN CSV
Size: 759.29 KB
Count of rows: 5662
Date updated: April 25, 2023, 10:09 a.m.
2022_12_31_en_vykydy_stantsii_npsv.xlsx
Name: 2022_12_31_en_vykydy_stantsii_npsv.xlsx
Format: EN XLSX
Size: 259.66 KB
Count of rows: 5662
Date updated: April 25, 2023, 10:09 a.m.
Name Format Size Count of rows Date updated
2022_12_31_uk_vykydy_stantsii_npsv.csv UK CSV 745.95 KB 5662 April 25, 2023, 10:07 a.m. Download
2022_12_31_uk_vykydy_stantsii_npsv.xlsx UK XLSX 270.27 KB 5662 April 25, 2023, 10:07 a.m. Download
2022_12_31_en_vykydy_stantsii_npsv.csv EN CSV 759.29 KB 5662 April 25, 2023, 10:09 a.m. Download
2022_12_31_en_vykydy_stantsii_npsv.xlsx EN XLSX 259.66 KB 5662 April 25, 2023, 10:09 a.m. Download