Information on structure of UGS (underground gas storage) operator costs, which are covered by tariffs for natural gas injection, withdrawal and storage. The costs are divided into three levels, so that by summing lower-level cost items one can obtain higher-level cost item.
Update date 27.09.2022 Not regularly
Data for period 01.08.2019 - 21.11.2024
Organization NEURC
Information on changes of tariffs for natural gas storage, injection and withdrawal, imposed by the National Energy and Utilities Regulatory Commission (NEURC) . Additionally, the numbers and effective dates of relevant NEURC resolutions are mentioned.
Update date 27.09.2022 Not regularly
Data for period 28.04.2004 - 21.11.2024
Organization NEURC
Information on distribution of expenses of UGS operator between tariffs for natural gas storage, injection and withdrawal. Besides, the type of expenditure is also mentioned (conditionally variable, conditionally fixed and mixed). The distribution is provided for by the Resolution of National Energy and Utilities Regulatory Commission №1131 dated 13/06/2021.
Update date 21.09.2021 Not regularly
Data for period 13.06.2016 - 21.11.2024
Organization NEURC
1-3 of 3 items
Select filters
Subject
Energy resource
Organization
Update frequency
Data for period
-
Cost