Capacity of transborder interconnection points (TSO data)
Field | Name | Description |
---|---|---|
date_start | Period start |
- |
date_end | Period end |
- |
country | Country |
Moldova, Slovakia, Poland, Romania, Russia, Hungary |
interconnection_point | Interconnection point of the GTS |
• Ananiiv, Grebenyky, Kaushany, Lymanske, Oleksiivka (Moldova) |
interconnection_point_type | Type of interconnection point of the GTS |
Entry / exit point |
capacity_type | Type of capacity |
Firm, interruptable |
capacity_technical | Technical capacity, mln m3/day |
million cubic meters per day |
capacity_available | Available capacity, mln m3/day |
million cubic meters per day |
capacity_allocated | Allocated capacity, mln m3/day |
million cubic meters per day |
notes | Notes |
- |
-
-
Moldova, Slovakia, Poland, Romania, Russia, Hungary
• Ananiiv, Grebenyky, Kaushany, Lymanske, Oleksiivka (Moldova)
• Drozdovichi, Hermanowice, VIP-PL-UA (Poland)
• Orlovka-Isaccea (Romania)
• Sokhranovka, Sudzha (Russia)
• Budince, Uzhgorod/Velke Kapusany (Slovakia)
• Beregovo, Beregdaroc, VIP Bereg (Hungary)
Entry / exit point
Firm, interruptable
million cubic meters per day
million cubic meters per day
million cubic meters per day
-
Name | Format | Size | Count of rows | Date updated | |
---|---|---|---|---|---|
2025_09_01_uk_potuzhnist_transkordonnyh_tochok_hts.csv | UK CSV | 447.38 KB | 3015 | Nov. 22, 2024, 6:21 p.m. | Download |
2025_09_01_uk_potuzhnist_transkordonnyh_tochok_hts.xlsx | UK XLSX | 135.33 KB | 3015 | Nov. 22, 2024, 6:21 p.m. | Download |
2025_09_01_en_potuzhnist_transkordonnyh_tochok_hts.csv | EN CSV | 270.32 KB | 3015 | Nov. 22, 2024, 6:22 p.m. | Download |
2025_09_01_en_potuzhnist_transkordonnyh_tochok_hts.xlsx | EN XLSX | 115.71 KB | 3015 | Nov. 22, 2024, 6:22 p.m. | Download |