Installed electricity production capacity of TPP GC by fuel type
Temporary not updated since 24.02.22
Information on the installed electrical capacity of Ukraine’s thermal power plants (TPP), detailed by the fuel types on which the stations operate (coal, gas and fuel oil).
The data do not include the temporarily occupied territories of Ukraine.
Update date
Feb. 14, 2022, 11:14 a.m.
Annually
Data for period
01.01.2015 - 31.12.2022
Organizations
National Power Company Ukrenergo
Sources
More
Show
Field | Name | Description |
---|---|---|
date_start | Date start |
- |
date_end | Date end |
- |
year | Year |
- |
fuel_type | Fuel type |
• Gas coal |
capacity_installed | Installed capacity, MW |
MW |
capacity_installed_perc | Share of the total value of the installed capacity, % |
% |
Name | Format | Size | Count of rows | Date updated | |
---|---|---|---|---|---|
2022_12_31_uk_vstanovlena_potuzhnist_tes_za_palyvom.csv | UK CSV | 2.29 KB | 24 | Feb. 14, 2022, 10:32 a.m. | Download |
2022_12_31_uk_vstanovlena_potuzhnist_tes_za_palyvom.xlsx | UK XLSX | 6.09 KB | 24 | Feb. 14, 2022, 10:32 a.m. | Download |
2022_12_31_en_vstanovlena_potuzhnist_tes_za_palyvom.csv | EN CSV | 1.70 KB | 24 | Feb. 14, 2022, 10:32 a.m. | Download |
2022_12_31_en_vstanovlena_potuzhnist_tes_za_palyvom.xlsx | EN XLSX | 5.91 KB | 24 | Feb. 14, 2022, 10:32 a.m. | Download |