List of cross-border electrical networks through which access to the transfer capacity is provided, indicating the value of the transfer capacity, customs regime (export / import), the number of lines, and voltage class for each of the cross-sections.

Update date Sept. 27, 2021, 5:07 p.m. Annually
Coverage period 01.01.2016 - 31.12.2019
Organizations
NEURC
Sources
More Show
2019_12_31_uk_mizhderzhavni_peretyny_dostup.csv
Name: 2019_12_31_uk_mizhderzhavni_peretyny_dostup.csv
Format: UK CSV
Size: 12.21 KB
Count of rows: 82
Date updated: Sept. 27, 2021, 5:02 p.m.
2019_12_31_uk_mizhderzhavni_peretyny_dostup.xlsx
Name: 2019_12_31_uk_mizhderzhavni_peretyny_dostup.xlsx
Format: UK XLSX
Size: 8.40 KB
Count of rows: 82
Date updated: Sept. 27, 2021, 5:02 p.m.
2019_12_31_en_mizhderzhavni_peretyny_dostup.csv
Name: 2019_12_31_en_mizhderzhavni_peretyny_dostup.csv
Format: EN CSV
Size: 8.53 KB
Count of rows: 82
Date updated: Sept. 27, 2021, 5:03 p.m.
2019_12_31_en_mizhderzhavni_peretyny_dostup.xlsx
Name: 2019_12_31_en_mizhderzhavni_peretyny_dostup.xlsx
Format: EN XLSX
Size: 7.89 KB
Count of rows: 82
Date updated: Sept. 27, 2021, 5:03 p.m.
Name Format Size Count of rows Date updated
2019_12_31_uk_mizhderzhavni_peretyny_dostup.csv UK CSV 12.21 KB 82 Sept. 27, 2021, 5:02 p.m. Download
2019_12_31_uk_mizhderzhavni_peretyny_dostup.xlsx UK XLSX 8.40 KB 82 Sept. 27, 2021, 5:02 p.m. Download
2019_12_31_en_mizhderzhavni_peretyny_dostup.csv EN CSV 8.53 KB 82 Sept. 27, 2021, 5:03 p.m. Download
2019_12_31_en_mizhderzhavni_peretyny_dostup.xlsx EN XLSX 7.89 KB 82 Sept. 27, 2021, 5:03 p.m. Download
Field Name Description
date_start Date start

-

date_end Date end

-

year Year

-

cross_border_direction Cross-border connection

Cross-border connection between Ukraine and neighboring countries (Moldova, Poland, Romania, Slovakia, Hungary; Russia and Belarus (up to 24.02.2022).
On February 24, 2022, Ukraine’s energy system was disconnected from the power systems of Russia and Belarus, respectively, there were no electricity flows since that period. Additionally, from that period, two separate trade zones "Burshtyn energy island" and "Integrated Power System of Ukraine" were merged into one.

capacity_net Net available capacity

MW

customs_regime Customs regime

Export, import

line_number Number of transmission lines

units

line_voltage Voltage

kV

Field
Name
date_start
Date start
Description

-

Field
Name
date_end
Date end
Description

-

Field
Name
year
Year
Description

-

Field
Name
cross_border_direction
Cross-border connection
Description

Cross-border connection between Ukraine and neighboring countries (Moldova, Poland, Romania, Slovakia, Hungary; Russia and Belarus (up to 24.02.2022).
On February 24, 2022, Ukraine’s energy system was disconnected from the power systems of Russia and Belarus, respectively, there were no electricity flows since that period. Additionally, from that period, two separate trade zones "Burshtyn energy island" and "Integrated Power System of Ukraine" were merged into one.

Field
Name
capacity_net
Net available capacity
Description

MW

Field
Name
customs_regime
Customs regime
Description

Export, import

Field
Name
line_number
Number of transmission lines
Description

units

Field
Name
line_voltage
Voltage
Description

kV