Information on the results of yearly capacity allocation auctions at the interconnection points of the Ukrainian gas transportation system (GTS). The data is broken down by interconnection points, and includes information on the type of capacity, the amount of free capacity and the total capacity distributed within the auction. The starting and final price of capacities allocation is also mentioned.
Update date Nov. 14, 2024, 1:29 p.m. Annually
Data for period 01.10.2020 - 30.09.2025
Organizations
Gas Transmission System Operator of Ukraine LLC
Sources
More Show
Field Name Description
period_date_start Capacity allocated starting from

-

period_date_end Capacity allocated until

-

interconnection_point Interconnection point of the GTS

• Ananiiv, Grebenyky, Kaushany, Lymanske, Oleksiivka (Moldova)
• GCP "GAZ-SYSTEM/UATSO" (Poland)
• Orlovka-Isaccea (Romania)
• Sokhranovka, Sudzha (Russia)
• Budince, Uzhgorod/Velke Kapusany (Slovakia)
• VIP Bereg (Hungary)

country Country

Moldova, Slovakia, Poland, Romania, Russia, Hungary

eic Energy identification code (EIC)

-

interconnection_point_type Type of interconnection point of the GTS

Entry, exit

capacity_type Type of capacity

Firm unbundled, interruptable unbundled

capacity_free Free capacity, mcm/day

million cubic meters per day

price_start Starting price of auction, USD

USD per thousand cubic meter per day without VAT

capacity_allocated Allocated capacity, mcm/day

million cubic meters per day

price_final Final price, USD

USD per thousand cubic meter per day without VAT

notes Notes

-

Field
Name
period_date_start
Capacity allocated starting from
Description

-

Field
Name
period_date_end
Capacity allocated until
Description

-

Field
Name
interconnection_point
Interconnection point of the GTS
Description

• Ananiiv, Grebenyky, Kaushany, Lymanske, Oleksiivka (Moldova)
• GCP "GAZ-SYSTEM/UATSO" (Poland)
• Orlovka-Isaccea (Romania)
• Sokhranovka, Sudzha (Russia)
• Budince, Uzhgorod/Velke Kapusany (Slovakia)
• VIP Bereg (Hungary)

Field
Name
country
Country
Description

Moldova, Slovakia, Poland, Romania, Russia, Hungary

Field
Name
eic
Energy identification code (EIC)
Description

-

Field
Name
interconnection_point_type
Type of interconnection point of the GTS
Description

Entry, exit

Field
Name
capacity_type
Type of capacity
Description

Firm unbundled, interruptable unbundled

Field
Name
capacity_free
Free capacity, mcm/day
Description

million cubic meters per day

Field
Name
price_start
Starting price of auction, USD
Description

USD per thousand cubic meter per day without VAT

Field
Name
capacity_allocated
Allocated capacity, mcm/day
Description

million cubic meters per day

Field
Name
price_final
Final price, USD
Description

USD per thousand cubic meter per day without VAT

Field
Name
notes
Notes
Description

-

2025_09_30_uk_rozpodil_richnykh_potuzhnostei.csv
Name: 2025_09_30_uk_rozpodil_richnykh_potuzhnostei.csv
Format: UK CSV
Size: 7.79 KB
Count of rows: 47
Date updated: Nov. 14, 2024, 1:28 p.m.
2025_09_30_uk_rozpodil_richnykh_potuzhnostei.xlsx
Name: 2025_09_30_uk_rozpodil_richnykh_potuzhnostei.xlsx
Format: UK XLSX
Size: 7.98 KB
Count of rows: 47
Date updated: Nov. 14, 2024, 1:28 p.m.
2025_09_30_en_rozpodil_richnykh_potuzhnostei.csv
Name: 2025_09_30_en_rozpodil_richnykh_potuzhnostei.csv
Format: EN CSV
Size: 5.14 KB
Count of rows: 47
Date updated: Nov. 14, 2024, 1:29 p.m.
2025_09_30_en_rozpodil_richnykh_potuzhnostei.xlsx
Name: 2025_09_30_en_rozpodil_richnykh_potuzhnostei.xlsx
Format: EN XLSX
Size: 7.48 KB
Count of rows: 47
Date updated: Nov. 14, 2024, 1:29 p.m.
Name Format Size Count of rows Date updated
2025_09_30_uk_rozpodil_richnykh_potuzhnostei.csv UK CSV 7.79 KB 47 Nov. 14, 2024, 1:28 p.m. Download
2025_09_30_uk_rozpodil_richnykh_potuzhnostei.xlsx UK XLSX 7.98 KB 47 Nov. 14, 2024, 1:28 p.m. Download
2025_09_30_en_rozpodil_richnykh_potuzhnostei.csv EN CSV 5.14 KB 47 Nov. 14, 2024, 1:29 p.m. Download
2025_09_30_en_rozpodil_richnykh_potuzhnostei.xlsx EN XLSX 7.48 KB 47 Nov. 14, 2024, 1:29 p.m. Download