Information on the results of yearly capacity allocation auctions at the interconnection points of the Ukrainian gas transportation system (GTS). The data is broken down by interconnection points, and includes information on the type of capacity, the amount of free capacity and the total capacity distributed within the auction. The starting and final price of capacities allocation is also mentioned.
Data for period
Oct. 1, 2020 - Sept. 30, 2025
Update frequency
Annually
Organizations
Gas Transmission System Operator of Ukraine LLC
Unique identifier
d7b8bbc3-4590-4a09-9291-40185076de56
Capacity allocated starting from | Capacity allocated until | Interconnection point of the GTS | Country | Energy identification code (EIC) | Type of interconnection point of the GTS | Type of capacity | Free capacity, mcm/day | Starting price of auction, USD | Allocated capacity, mcm/day | Final price, USD | Notes |
---|---|---|---|---|---|---|---|---|---|---|---|
2020-10-01 | 2021-09-30 | Ananiiv | Moldova | 21Z000000000176I | Exit | Interruptible unbundled | 8.17 | ||||
2020-10-01 | 2021-09-30 | Budince | Slovakia | 21Z000000000357E | Entry | Interruptible unbundled | 4.45 | ||||
2020-10-01 | 2021-09-30 | Budince | Slovakia | 21Z000000000357E | Exit | Interruptible unbundled | 9.68 | ||||
2020-10-01 | 2021-09-30 | Grebenyky | Moldova | 21Z000000000178E | Entry | Interruptible unbundled | 3.56 | 0 | |||
2020-10-01 | 2021-09-30 | Grebenyky | Moldova | 21Z000000000178E | Exit | Interruptible unbundled | 8.17 | ||||
2020-10-01 | 2021-09-30 | GCP "GAZ-SYSTEM/UATSO" | Poland | 21Z000000000508J | Entry | Interruptible unbundled | 9.99 | 4.45 | |||
2020-10-01 | 2021-09-30 | GCP "GAZ-SYSTEM/UATSO" | Poland | 21Z000000000508J | Exit | Interruptible unbundled | 4.7 | 9.04 | |||
2020-10-01 | 2021-09-30 | Kaushany | Moldova | 21Z000000000179C | Entry | Interruptible unbundled | |||||
2020-10-01 | 2021-09-30 | Kaushany | Moldova | 21Z000000000179C | Exit | Interruptible unbundled | 10.35 | 1.13 | |||
2020-10-01 | 2021-09-30 | Lymanske | Moldova | 21Z000000000360P | Entry | Interruptible unbundled | 1.94 | 4.45 | |||
2020-10-01 | 2021-09-30 | Lymanske | Moldova | 21Z000000000360P | Exit | Interruptible unbundled | 0.65 | 8.17 | |||
2020-10-01 | 2021-09-30 | Oleksiivka | Moldova | 21Z000000000182N | Exit | Interruptible unbundled | 9.71 | ||||
2020-10-01 | 2021-09-30 | OrlIvka-Isaccea I | Romania | 21Z000000000304Z | Entry | Interruptible unbundled | 10.35 | 4.45 | OrlIvka-Isaccea point is available only on the condition of simultaneous booking of capacites of entry point Kaushany and Grebenyky | ||
2020-10-01 | 2021-09-30 | OrlIvka-Isaccea I | Romania | 21Z000000000304Z | Exit | Interruptible unbundled | 1.13 | ||||
2020-10-01 | 2021-09-30 | Sokhranovka | Russia | 21Z000000000187D | Entry | Interruptible unbundled | 16.01 | ||||
2020-10-01 | 2021-09-30 | Sudzha | Russia | 21Z000000000188B | Entry | Interruptible unbundled | 16.01 | ||||
2020-10-01 | 2021-09-30 | Uzhgorod/Velke Kapusany | Slovakia | 21Z000000000085L | Entry | Interruptible unbundled | 59.85 | 4.45 | |||
2020-10-01 | 2021-09-30 | Uzhgorod/Velke Kapusany | Slovakia | 21Z000000000085L | Exit | Interruptible unbundled | 9.68 | ||||
2020-10-01 | 2021-09-30 | Virtual exit point to near- border Moldavian customers | Moldova | 56ZG-EXP-MD-000T | Exit | Interruptible unbundled | 0.56 |
Field | Name | Description |
---|---|---|
period_date_start | Capacity allocated starting from | - |
period_date_end | Capacity allocated until | - |
interconnection_point | Interconnection point of the GTS | • Ananiiv, Grebenyky, Kaushany, Lymanske, Oleksiivka (Moldova) • GCP "GAZ-SYSTEM/UATSO" (Poland) • Orlovka-Isaccea (Romania) • Sokhranovka, Sudzha (Russia) • Budince, Uzhgorod/Velke Kapusany (Slovakia) • VIP Bereg (Hungary) |
country | Country | Moldova, Slovakia, Poland, Romania, Russia, Hungary |
eic | Energy identification code (EIC) | - |
interconnection_point_type | Type of interconnection point of the GTS | Entry, exit |
capacity_type | Type of capacity | Firm unbundled, interruptable unbundled |
capacity_free | Free capacity, mcm/day | million cubic meters per day |
price_start | Starting price of auction, USD | USD per thousand cubic meter per day without VAT |
capacity_allocated | Allocated capacity, mcm/day | million cubic meters per day |
price_final | Final price, USD | USD per thousand cubic meter per day without VAT |
notes | Notes | - |
Name | Update date | Lines number | Size | Format | Download |
---|---|---|---|---|---|
2025_09_30_uk_rozpodil_richnykh_potuzhnostei.csv | 47 | 7.79 kB | UK CSV | ||
2025_09_30_uk_rozpodil_richnykh_potuzhnostei.xlsx | 47 | 7.98 kB | UK XLSX | ||
2025_09_30_en_rozpodil_richnykh_potuzhnostei.csv | 47 | 5.14 kB | EN CSV | ||
2025_09_30_en_rozpodil_richnykh_potuzhnostei.xlsx | 47 | 7.48 kB | EN XLSX |
Download