Results of yeraly capacity allocation auctions for interconnection points of Ukrainian GTS
Field | Name | Description |
---|---|---|
period_date_start | Capacity allocated starting from |
- |
period_date_end | Capacity allocated until |
- |
interconnection_point | Interconnection point of the GTS |
• Ananiiv, Grebenyky, Kaushany, Lymanske, Oleksiivka (Moldova) |
country | Country |
Moldova, Slovakia, Poland, Romania, Russia, Hungary |
eic | Energy identification code (EIC) |
- |
interconnection_point_type | Type of interconnection point of the GTS |
Entry, exit |
capacity_type | Type of capacity |
Firm unbundled, interruptable unbundled |
capacity_free | Free capacity, mcm/day |
million cubic meters per day |
price_start | Starting price of auction, USD |
USD per thousand cubic meter per day without VAT |
capacity_allocated | Allocated capacity, mcm/day |
million cubic meters per day |
price_final | Final price, USD |
USD per thousand cubic meter per day without VAT |
notes | Notes |
- |
-
-
• Ananiiv, Grebenyky, Kaushany, Lymanske, Oleksiivka (Moldova)
• GCP "GAZ-SYSTEM/UATSO" (Poland)
• Orlovka-Isaccea (Romania)
• Sokhranovka, Sudzha (Russia)
• Budince, Uzhgorod/Velke Kapusany (Slovakia)
• VIP Bereg (Hungary)
Moldova, Slovakia, Poland, Romania, Russia, Hungary
-
Entry, exit
Firm unbundled, interruptable unbundled
million cubic meters per day
USD per thousand cubic meter per day without VAT
million cubic meters per day
USD per thousand cubic meter per day without VAT
-
Name | Format | Size | Count of rows | Date updated | |
---|---|---|---|---|---|
2025_09_30_uk_rozpodil_richnykh_potuzhnostei.csv | UK CSV | 7.79 KB | 47 | Nov. 14, 2024, 1:28 p.m. | Download |
2025_09_30_uk_rozpodil_richnykh_potuzhnostei.xlsx | UK XLSX | 7.98 KB | 47 | Nov. 14, 2024, 1:28 p.m. | Download |
2025_09_30_en_rozpodil_richnykh_potuzhnostei.csv | EN CSV | 5.14 KB | 47 | Nov. 14, 2024, 1:29 p.m. | Download |
2025_09_30_en_rozpodil_richnykh_potuzhnostei.xlsx | EN XLSX | 7.48 KB | 47 | Nov. 14, 2024, 1:29 p.m. | Download |