Go back

Data

Ukrenergo's tariffs structure for electricity transmission

Ukrenergo's tariffs structure for electricity transmission

Download dataset

Description
Data sample
Fields description
Files

Information on the structure of tariffs for transmission services by trunk and interstate electrical networks by the Transmission System Operator (TSO) NPC "Ukrenergo". Key indicators are: cost components that are included in the tariff calculation and costs in the current tariff.

NPC "Ukrenergo" as TSO provides transmission of electric power by trunk and interstate networks with a voltage of 110-750 kV from generation to the networks of Distribution System Operators (DSOs) with compliance with electricity and transmission quality criteria and it is responsible for the maintenance, reconstruction and development of the transmission system.

Data for period

July 1, 2019 - Dec. 31, 2025

Update frequency

Not regularly

Unique identifier

99afaccc-6768-4d30-ac4f-0fd736dc26a3
Date of beginning of validityKey indicators included in the tariff calculationExpenses typeAmount
2019-07-01Operational costsMaterial costs179370
2019-07-01Operational costsCosts of purchasing electrical energy to offset technological flows of electricity3083090
2019-07-01Operational costsLabour costs825239
2019-07-01Operational costsContributions to social activities181552
2019-07-01Operational costsAmortization476810
2019-07-01Operational costsExpenditure (revenue) on management of cross-border connections capacity allocation restrictions0
2019-07-01Operational costsOther operational costs143283
2019-07-01Operational costsAdjustment of required income (expenditure)-244313
2019-07-01Financial costs308935
2019-07-01Profit costs1478096
2019-07-01Electricity transmission volume54195000
2019-07-01Tariff347.43
2019-07-01Costs of special duties implementation in the public interest12396852
FieldNameDescription
date_startDate of beginning of validity
cost_level_1Key indicators included in the tariff calculationThe list of components of the electricity transmission costs included in the tariff calculation as well as the volume of transmission / consumption, electricity export and the size of the final tariff
cost_level_2Expenses typeDetails of operational costs: • material costs • costs to offset technological flows of electricity • labour costs • contributions to social activities • amortization • expenditure on management of cross-border connections capacity allocation restrictions • other operational costs • adjustment of required income
amountAmountUnits of measurement: • electricity transmission / consumption - MW • tariff - UAH/MWh • other types of expenses - thousand UAH
NameUpdate dateLines numberSizeFormatDownload

2025_12_31_uk_struktura_taryfiv_ukrenerho_peredacha.csv

190

27.53 kB

UK
CSV

2025_12_31_uk_struktura_taryfiv_ukrenerho_peredacha.xlsx

190

10.62 kB

UK
XLSX

2025_12_31_en_struktura_taryfiv_ukrenerho_peredacha.csv

190

14.71 kB

EN
CSV

2025_12_31_en_struktura_taryfiv_ukrenerho_peredacha.xlsx

190

9.5 kB

EN
XLSX