Information on the structure of tariffs for transmission services by trunk and interstate electrical networks by the Transmission System Operator (TSO) NPC "Ukrenergo". Key indicators are: cost components that are included in the tariff calculation and costs in the current tariff.
NPC "Ukrenergo" as TSO provides transmission of electric power by trunk and interstate networks with a voltage of 110-750 kV from generation to the networks of Distribution System Operators (DSOs) with compliance with electricity and transmission quality criteria and it is responsible for the maintenance, reconstruction and development of the transmission system.
Data for period
July 1, 2019 - Dec. 31, 2025
Update frequency
Not regularly
Organizations
Unique identifier
Date of beginning of validity | Key indicators included in the tariff calculation | Expenses type | Amount |
---|---|---|---|
2019-07-01 | Operational costs | Material costs | 179370 |
2019-07-01 | Operational costs | Costs of purchasing electrical energy to offset technological flows of electricity | 3083090 |
2019-07-01 | Operational costs | Labour costs | 825239 |
2019-07-01 | Operational costs | Contributions to social activities | 181552 |
2019-07-01 | Operational costs | Amortization | 476810 |
2019-07-01 | Operational costs | Expenditure (revenue) on management of cross-border connections capacity allocation restrictions | 0 |
2019-07-01 | Operational costs | Other operational costs | 143283 |
2019-07-01 | Operational costs | Adjustment of required income (expenditure) | -244313 |
2019-07-01 | Financial costs | 308935 | |
2019-07-01 | Profit costs | 1478096 | |
2019-07-01 | Electricity transmission volume | 54195000 | |
2019-07-01 | Tariff | 347.43 | |
2019-07-01 | Costs of special duties implementation in the public interest | 12396852 |
Field | Name | Description |
---|---|---|
date_start | Date of beginning of validity | |
cost_level_1 | Key indicators included in the tariff calculation | The list of components of the electricity transmission costs included in the tariff calculation as well as the volume of transmission / consumption, electricity export and the size of the final tariff |
cost_level_2 | Expenses type | Details of operational costs: • material costs • costs to offset technological flows of electricity • labour costs • contributions to social activities • amortization • expenditure on management of cross-border connections capacity allocation restrictions • other operational costs • adjustment of required income |
amount | Amount | Units of measurement: • electricity transmission / consumption - MW • tariff - UAH/MWh • other types of expenses - thousand UAH |
Name | Update date | Lines number | Size | Format | Download |
---|---|---|---|---|---|
2025_12_31_uk_struktura_taryfiv_ukrenerho_peredacha.csv | 190 | 27.53 kB | UK CSV | ||
2025_12_31_uk_struktura_taryfiv_ukrenerho_peredacha.xlsx | 190 | 10.62 kB | UK XLSX | ||
2025_12_31_en_struktura_taryfiv_ukrenerho_peredacha.csv | 190 | 14.71 kB | EN CSV | ||
2025_12_31_en_struktura_taryfiv_ukrenerho_peredacha.xlsx | 190 | 9.5 kB | EN XLSX |