Information on the structure of tariffs for electricity distribution services based on the Regulatory Asset Base (RAB), which is set by the NEURC together with tariffs for electricity distribution. Key indicators are: cost components that are included in the tariff calculation and costs in the current tariff.


RAB regulation is a system of long-term tariff formation, the main purpose of which is to attract investment in the development and modernization of electrical networks and stimulate the efficiency of DSOs' costs. Such regulation helps to reduce the cost and shorten the period of connection to the power grids of new consumers, improve the quality of the distribution service to existing consumers and reduce the loss of electricity in the networks.

As of 2024, 26 DSOs operate using RAB regulation, the rest - according to the "COST+" method.

Update date Dec. 19, 2023, 12:32 p.m. Annually
Data for period 01.01.2021 - 31.12.2024
Organizations
NEURC
Sources
More Show
Field Name Description
date_start Date start

-

date_end Date end

-

year Year

-

company_code Company USREOU code

-

company_name Company name

-

costs_level_1 Key indicators included in the tariff calculation

List of cost components included in the tariff calculation, including operating expenses, compensation for technological losses of electricity, depreciation, profit margin on the regulatory asset base, taxes, and income adjustments

costs_level_2 Costs type

Information on elements of operating expenses: labor costs, social benefits, services of the transmission system operator and dispatching, conducting buying and selling operations on the DAM and IDM, contributions for regulation, and others

costs_amount Amount, thousand UAH

UAH thousand

costs_amount_perc Share of total costs,%

%

resolution_number NEURC resolution number

-

resolution_date NEURC resolution date

-

resolution_link NEURC resolution link

-

Field
Name
date_start
Date start
Description

-

Field
Name
date_end
Date end
Description

-

Field
Name
year
Year
Description

-

Field
Name
company_code
Company USREOU code
Description

-

Field
Name
company_name
Company name
Description

-

Field
Name
costs_level_1
Key indicators included in the tariff calculation
Description

List of cost components included in the tariff calculation, including operating expenses, compensation for technological losses of electricity, depreciation, profit margin on the regulatory asset base, taxes, and income adjustments

Field
Name
costs_level_2
Costs type
Description

Information on elements of operating expenses: labor costs, social benefits, services of the transmission system operator and dispatching, conducting buying and selling operations on the DAM and IDM, contributions for regulation, and others

Field
Name
costs_amount
Amount, thousand UAH
Description

UAH thousand

Field
Name
costs_amount_perc
Share of total costs,%
Description

%

Field
Name
resolution_number
NEURC resolution number
Description

-

Field
Name
resolution_date
NEURC resolution date
Description

-

Field
Name
resolution_link
NEURC resolution link
Description

-

2024_12_31_uk_struktura_vytrat_rozpodil_rab.csv
Name: 2024_12_31_uk_struktura_vytrat_rozpodil_rab.csv
Format: UK CSV
Size: 797.14 KB
Count of rows: 2070
Date updated: Dec. 19, 2023, 12:30 p.m.
2024_12_31_uk_struktura_vytrat_rozpodil_rab.xlsx
Name: 2024_12_31_uk_struktura_vytrat_rozpodil_rab.xlsx
Format: UK XLSX
Size: 156.89 KB
Count of rows: 2070
Date updated: Dec. 19, 2023, 12:30 p.m.
2024_12_31_en_struktura_vytrat_rozpodil_rab.csv
Name: 2024_12_31_en_struktura_vytrat_rozpodil_rab.csv
Format: EN CSV
Size: 581.10 KB
Count of rows: 2070
Date updated: Dec. 19, 2023, 12:30 p.m.
2024_12_31_en_struktura_vytrat_rozpodil_rab.xlsx
Name: 2024_12_31_en_struktura_vytrat_rozpodil_rab.xlsx
Format: EN XLSX
Size: 132.29 KB
Count of rows: 2070
Date updated: Dec. 19, 2023, 12:30 p.m.
Name Format Size Count of rows Date updated
2024_12_31_uk_struktura_vytrat_rozpodil_rab.csv UK CSV 797.14 KB 2070 Dec. 19, 2023, 12:30 p.m. Download
2024_12_31_uk_struktura_vytrat_rozpodil_rab.xlsx UK XLSX 156.89 KB 2070 Dec. 19, 2023, 12:30 p.m. Download
2024_12_31_en_struktura_vytrat_rozpodil_rab.csv EN CSV 581.10 KB 2070 Dec. 19, 2023, 12:30 p.m. Download
2024_12_31_en_struktura_vytrat_rozpodil_rab.xlsx EN XLSX 132.29 KB 2070 Dec. 19, 2023, 12:30 p.m. Download