Information on technical capacity of domestic interconnection points of Ukrainian GTS (both physical and virtual points).

Data for period

Jan. 1, 2020 - Sept. 1, 2025

Update frequency

Annually

Unique identifier

70a26cf2-a657-4267-9034-3bb662083bb2
DateType of interconnection point of the GTSVirtual point nameVirtual point EIC codePhysical point namePhysical point EIC codeTechnical capacity, thousand m3 / day
2025-02-01exitUkravtohaz (AHNKS Berdychiv)56ZOPZHI40967029AHNKS №1 Berdychiv (HRS Hryshkivtsi)56ZOPZHI40967029236.856
2025-03-01exitUkravtohaz (AHNKS Berdychiv)56ZOPZHI40967029AHNKS №1 Berdychiv (HRS Hryshkivtsi)56ZOPZHI40967029236.856
2025-04-01exitUkravtohaz (AHNKS Berdychiv)56ZOPZHI40967029AHNKS №1 Berdychiv (HRS Hryshkivtsi)56ZOPZHI40967029236.856
2025-05-01exitUkravtohaz (AHNKS Berdychiv)56ZOPZHI40967029AHNKS №1 Berdychiv (HRS Hryshkivtsi)56ZOPZHI40967029236.856
2025-06-01exitUkravtohaz (AHNKS Berdychiv)56ZOPZHI40967029AHNKS №1 Berdychiv (HRS Hryshkivtsi)56ZOPZHI40967029236.856
2025-07-01exitUkravtohaz (AHNKS Berdychiv)56ZOPZHI40967029AHNKS №1 Berdychiv (HRS Hryshkivtsi)56ZOPZHI40967029236.856
2025-08-01exitUkravtohaz (AHNKS Berdychiv)56ZOPZHI40967029AHNKS №1 Berdychiv (HRS Hryshkivtsi)56ZOPZHI40967029236.856
2025-09-01exitUkravtohaz (AHNKS Berdychiv)56ZOPZHI40967029AHNKS №1 Berdychiv (HRS Hryshkivtsi)56ZOPZHI40967029236.856
2024-10-01exitTsersanit-invest56ZOPZHI41097024TOV Tsersanit-Invest56ZOPZHI41097024151.488
2024-11-01exitTsersanit-invest56ZOPZHI41097024TOV Tsersanit-Invest56ZOPZHI41097024151.488
2024-12-01exitTsersanit-invest56ZOPZHI41097024TOV Tsersanit-Invest56ZOPZHI41097024151.488
2025-01-01exitTsersanit-invest56ZOPZHI41097024TOV Tsersanit-Invest56ZOPZHI41097024151.488
2025-02-01exitTsersanit-invest56ZOPZHI41097024TOV Tsersanit-Invest56ZOPZHI41097024151.488
2025-03-01exitTsersanit-invest56ZOPZHI41097024TOV Tsersanit-Invest56ZOPZHI41097024151.488
2025-04-01exitTsersanit-invest56ZOPZHI41097024TOV Tsersanit-Invest56ZOPZHI41097024151.488
2025-05-01exitTsersanit-invest56ZOPZHI41097024TOV Tsersanit-Invest56ZOPZHI41097024151.488
2025-06-01exitTsersanit-invest56ZOPZHI41097024TOV Tsersanit-Invest56ZOPZHI41097024151.488
2025-07-01exitTsersanit-invest56ZOPZHI41097024TOV Tsersanit-Invest56ZOPZHI41097024151.488
2025-08-01exitTsersanit-invest56ZOPZHI41097024TOV Tsersanit-Invest56ZOPZHI41097024151.488
FieldNameDescription
dateDate-
domestic_point_typeType of interconnection point of the GTSEntry, exit
virtual_point_nameVirtual point name-
virtual_point_eicVirtual point EIC code-
physical_point_namePhysical point name-
physical_point_eicPhysical point EIC code-
capacity_technicalTechnical capacity, thousand m3 / daythousand cubic meters per day
NameUpdate dateLines numberSizeFormatDownload

2025_09_01_uk_potuzhnist_vnutrishni_tochky_hts.xlsx

137092

7.15 MB

UK
XLSX

2025_09_01_en_potuzhnist_vnutrishni_tochky_hts.csv

137092

13.76 MB

EN
CSV

2025_09_01_en_potuzhnist_vnutrishni_tochky_hts.xlsx

137092

6.24 MB

EN
XLSX

2025_09_01_uk_potuzhnist_vnutrishni_tochky_hts.csv

137092

19.35 MB

UK
CSV