Information on the results of within-day capacity allocation auctions at the interconnection points of the Ukrainian gas transportation system (GTS). The data is broken down by interconnection points, and includes information on the type of capacity, the amount of free capacity and the total capacity distributed within the auction. The starting and final price of capacities allocation is also mentioned.
Update date Dec. 18, 2024, 8:16 a.m. Not regularly
Data for period 02.10.2020 - 27.11.2024
Organizations
Gas Transmission System Operator of Ukraine LLC
Sources
More Show
Field Name Description
auction_number Auction number

-

interconnection_point Interconnection point of the GTS

• Budince / Uzhgorod-Velke Kapusany (Slovakia)
• VIP Bereg (Hungary)
• Kaushany (Moldova)
• GCP GAZ-SYSTEM/UA TSO (Poland)

country Country

Slovakia / Hungary / Moldova / Poland

eic Energy identification code (EIC)

-

interconnection_point_type Type of interconnection point of the GTS

Entry / exit

capacity_type Type of capacity

Guaranteed unbundled

period_date_start Start date

The date, starting from which the capacity is allocated

time_start Start time

The hour, starting from which the capacity is allocated (7 standing for 7 a.m., 13 standing for 13 p.m., etc)

period_date_end End date

The date, til which the capacity is allocated

time_end End time

The hour, til which the capacity is allocated (7 standing for 7 a.m., 13 standing for 13 p.m., etc)

capacity_free Free capacity, m3/day

Cubic meters per day

price_start Starting price of auction, USD

USD

capacity_allocated Allocated capacity, m3/day

Cubic meters per day

price_final Final price, USD

USD

Field
Name
auction_number
Auction number
Description

-

Field
Name
interconnection_point
Interconnection point of the GTS
Description

• Budince / Uzhgorod-Velke Kapusany (Slovakia)
• VIP Bereg (Hungary)
• Kaushany (Moldova)
• GCP GAZ-SYSTEM/UA TSO (Poland)

Field
Name
country
Country
Description

Slovakia / Hungary / Moldova / Poland

Field
Name
eic
Energy identification code (EIC)
Description

-

Field
Name
interconnection_point_type
Type of interconnection point of the GTS
Description

Entry / exit

Field
Name
capacity_type
Type of capacity
Description

Guaranteed unbundled

Field
Name
period_date_start
Start date
Description

The date, starting from which the capacity is allocated

Field
Name
time_start
Start time
Description

The hour, starting from which the capacity is allocated (7 standing for 7 a.m., 13 standing for 13 p.m., etc)

Field
Name
period_date_end
End date
Description

The date, til which the capacity is allocated

Field
Name
time_end
End time
Description

The hour, til which the capacity is allocated (7 standing for 7 a.m., 13 standing for 13 p.m., etc)

Field
Name
capacity_free
Free capacity, m3/day
Description

Cubic meters per day

Field
Name
price_start
Starting price of auction, USD
Description

USD

Field
Name
capacity_allocated
Allocated capacity, m3/day
Description

Cubic meters per day

Field
Name
price_final
Final price, USD
Description

USD

2024_11_27_uk_rozpodil_vnutrishnodobovykh_potuzhnostei_hts.xlsx
Name: 2024_11_27_uk_rozpodil_vnutrishnodobovykh_potuzhnostei_hts.xlsx
Format: UK XLSX
Size: 16.19 KB
Count of rows: 146
Date updated: Dec. 18, 2024, 8:15 a.m.
2024_11_27_en_rozpodil_vnutrishnodobovykh_potuzhnostei_hts.csv
Name: 2024_11_27_en_rozpodil_vnutrishnodobovykh_potuzhnostei_hts.csv
Format: EN CSV
Size: 19.79 KB
Count of rows: 146
Date updated: Dec. 18, 2024, 8:16 a.m.
2024_11_27_en_rozpodil_vnutrishnodobovykh_potuzhnostei_hts.xlsx
Name: 2024_11_27_en_rozpodil_vnutrishnodobovykh_potuzhnostei_hts.xlsx
Format: EN XLSX
Size: 15.33 KB
Count of rows: 146
Date updated: Dec. 18, 2024, 8:16 a.m.
2024_11_27_uk_rozpodil_vnutrishnodobovykh_potuzhnostei_hts.csv
Name: 2024_11_27_uk_rozpodil_vnutrishnodobovykh_potuzhnostei_hts.csv
Format: UK CSV
Size: 28.20 KB
Count of rows: 146
Date updated: Dec. 18, 2024, 8:15 a.m.
Name Format Size Count of rows Date updated
2024_11_27_uk_rozpodil_vnutrishnodobovykh_potuzhnostei_hts.xlsx UK XLSX 16.19 KB 146 Dec. 18, 2024, 8:15 a.m. Download
2024_11_27_en_rozpodil_vnutrishnodobovykh_potuzhnostei_hts.csv EN CSV 19.79 KB 146 Dec. 18, 2024, 8:16 a.m. Download
2024_11_27_en_rozpodil_vnutrishnodobovykh_potuzhnostei_hts.xlsx EN XLSX 15.33 KB 146 Dec. 18, 2024, 8:16 a.m. Download
2024_11_27_uk_rozpodil_vnutrishnodobovykh_potuzhnostei_hts.csv UK CSV 28.20 KB 146 Dec. 18, 2024, 8:15 a.m. Download