Go back

Data

Planned availability and actual use of generating capacity and controlled electric consumption installations

Planned availability and actual use of generating capacity and controlled electric consumption installations

Download dataset

Description
Data sample
Fields description
Files
Information on the forecast availability and actual load of generating capacities and power consumption units of the Integrated Power System of Ukraine (IPS). The data includes only units capable of regulation on an hourly basis.

Data for period

Oct. 1, 2019 - Sept. 21, 2022

Update frequency

Monthly

Unique identifier

689f55d7-851d-4355-ae22-3e06ccaceaed
DateHourType of generating facilitiesActual load, MWPlanned availability, MWDifference, MW
2022-09-2121NPP61406115-25
2022-09-2121TPP GC (pulverized coal)33303936606
2022-09-2121CHP (Kharkiv CHP-5, Kyiv CHP-5,6)3063104
2022-09-2121HPP of the Dnieper cascade and the Dniester river20652781.9716.9
2022-09-2121PSPP38114211040
2022-09-2122NPP61276115-12
2022-09-2122TPP GC (pulverized coal)33303936606
2022-09-2122CHP (Kharkiv CHP-5, Kyiv CHP-5,6)3073103
2022-09-2122HPP of the Dnieper cascade and the Dniester river19822781.9799.9
2022-09-2122PSPP8014211341
2022-09-2123NPP611261153
2022-09-2123TPP GC (pulverized coal)32923936644
2022-09-2123CHP (Kharkiv CHP-5, Kyiv CHP-5,6)29131019
2022-09-2123HPP of the Dnieper cascade and the Dniester river12722781.91509.9
2022-09-2123PSPP014211421
2022-09-2124NPP61446115-29
2022-09-2124TPP GC (pulverized coal)33893936547
2022-09-2124CHP (Kharkiv CHP-5, Kyiv CHP-5,6)25931051
2022-09-2124HPP of the Dnieper cascade and the Dniester river4902781.92291.9
FieldNameDescription
dateDate
hourHour
generation_typeType of generating facilities• NPP • TPP GC (pulverized coal) • CHP (Kharkiv CHP-5, Kyiv CHP-5,6) • HPP of the Dnieper cascade and the Dniester river • PSPP
loadActual load, MWActual load of generating facilities of Ukraine's IPS, MW
availabilityPlanned availability, MWPlanned availability of generating facilities of Ukraine's IPS, MW
balanceDifference, MWDifference between the planned availability and the actual load, MW
NameUpdate dateLines numberSizeFormatDownload

2022_09_21_uk_dostupnist_ta_vykorystannia_heneratsii.csv

127320

9.18 MB

UK
CSV

2022_09_21_uk_dostupnist_ta_vykorystannia_heneratsii.xlsx

127320

3.18 MB

UK
XLSX

2022_09_21_en_dostupnist_ta_vykorystannia_heneratsii.csv

127320

7.22 MB

EN
CSV

2022_09_21_en_dostupnist_ta_vykorystannia_heneratsii.xlsx

127320

3.28 MB

EN
XLSX