Information on the structure of average annual tariffs of NPC "Ukrenergo" for electricity transmission by trunk and interstate power grids, including payment for centralized dispatch control of the Integrated Power System (IPS) of Ukraine. Key indicators: constituent parts of costs, which are included in the calculation of the tariff and the amount of costs in the current tariff.

Update date Sept. 16, 2021, 1:06 p.m. Archive
Coverage period 01.01.2015 - 31.12.2019
Organizations
National Power Company Ukrenergo
Sources
More Show
2019_12_31_en_struktura_taryfiv_ukrenerho_peredacha_ta_dyspetch.csv
Name: 2019_12_31_en_struktura_taryfiv_ukrenerho_peredacha_ta_dyspetch.csv
Format: EN CSV
Size: 2.20 KB
Count of rows: 49
Date updated: Sept. 16, 2021, 1:06 p.m.
2019_12_31_en_struktura_taryfiv_ukrenerho_peredacha_ta_dyspetch.xlsx
Name: 2019_12_31_en_struktura_taryfiv_ukrenerho_peredacha_ta_dyspetch.xlsx
Format: EN XLSX
Size: 6.06 KB
Count of rows: 49
Date updated: Sept. 16, 2021, 1:06 p.m.
2019_12_31_uk_struktura_taryfiv_ukrenerho_peredacha_ta_dyspetch.csv
Name: 2019_12_31_uk_struktura_taryfiv_ukrenerho_peredacha_ta_dyspetch.csv
Format: UK CSV
Size: 3.67 KB
Count of rows: 49
Date updated: Sept. 16, 2021, 1:05 p.m.
2019_12_31_uk_struktura_taryfiv_ukrenerho_peredacha_ta_dyspetch.xlsx
Name: 2019_12_31_uk_struktura_taryfiv_ukrenerho_peredacha_ta_dyspetch.xlsx
Format: UK XLSX
Size: 6.33 KB
Count of rows: 49
Date updated: Sept. 16, 2021, 1:05 p.m.
Name Format Size Count of rows Date updated
2019_12_31_en_struktura_taryfiv_ukrenerho_peredacha_ta_dyspetch.csv EN CSV 2.20 KB 49 Sept. 16, 2021, 1:06 p.m. Download
2019_12_31_en_struktura_taryfiv_ukrenerho_peredacha_ta_dyspetch.xlsx EN XLSX 6.06 KB 49 Sept. 16, 2021, 1:06 p.m. Download
2019_12_31_uk_struktura_taryfiv_ukrenerho_peredacha_ta_dyspetch.csv UK CSV 3.67 KB 49 Sept. 16, 2021, 1:05 p.m. Download
2019_12_31_uk_struktura_taryfiv_ukrenerho_peredacha_ta_dyspetch.xlsx UK XLSX 6.33 KB 49 Sept. 16, 2021, 1:05 p.m. Download
Field Name Description
date_start Date of beginning of validity

-

cost_level_1 Expenses type

The list of components of the electricity transmission costs (incl. dispatching) included in the tariff calculation as well as the volume of network arrival and the size of the final tariff

cost_level_2 Expenses element

Details of operational costs:
• material costs
• labour costs
• amortization
• other costs

amount Current tariff expenses amount

Units of measurement:
network arrival - million kWh;
tariff - kop/kWh;
other types of expenses - thousand UAH.

Field
Name
date_start
Date of beginning of validity
Description

-

Field
Name
cost_level_1
Expenses type
Description

The list of components of the electricity transmission costs (incl. dispatching) included in the tariff calculation as well as the volume of network arrival and the size of the final tariff

Field
Name
cost_level_2
Expenses element
Description

Details of operational costs:
• material costs
• labour costs
• amortization
• other costs

Field
Name
amount
Current tariff expenses amount
Description

Units of measurement:
network arrival - million kWh;
tariff - kop/kWh;
other types of expenses - thousand UAH.