Go back

Data

Operating characteristics of CHPs, TPPs and large Boiler Plants included in the NERP

Operating characteristics of CHPs, TPPs and large Boiler Plants included in the NERP

Download dataset

Description
Data sample
Fields description
Files

Information on nominal capacity, operation status, annual number of operating hours and requirements for large combustion plants (Thermal Power Plants, Combined Heat and Power Plants, and large Boiler Plants) included in the National Emissions Reduction Plan (NERP). There is also information on the destruction of installations as a result of hostilities, as well as the location in temporarily uncontrolled territories.

NERP was approved by the decree of the Cabinet of Ministers of 08.11.2017 № 796-р and is a program document of the Government aimed at gradually reducing emissions of harmful substances into the air, implementing investment projects for the installation of equipment for cleaning exhaust gases and achieving European emission standards by combustion plants in accordance with the Directive 2010/75/EU on industrial emissions.

Data for period

Jan. 1, 2018 - Dec. 31, 2022

Update frequency

Annually

Unique identifier

324ae341-046e-43d7-a8a4-536b8f04acc5
Date startDate endYearUSREOU company codeCompany nameUnit IDUnit typeUnit numberUnit operation statusNominal thermal capacity of the unit, MWNumber of unit operation hours, h/yearEstablished installation requirement according to NERPNote
2018-01-012018-12-31201831831942LIMITED LIABILITY COMPANY "DTEK SKHIDENERHO"1power-generating unit1, 2, 3, 4unknown3276.5emission reduction (Annex 2)the unit is located on the territory where the state authorities of Ukraine temporarily do not exercise their powers, reporting data are not provided
2018-01-012018-12-31201831831942LIMITED LIABILITY COMPANY "DTEK SKHIDENERHO"2power-generating unit9, 10, 11work1747.62189emission reduction (Annex 2)
2018-01-012018-12-31201831831942LIMITED LIABILITY COMPANY "DTEK SKHIDENERHO"3power-generating unit13, 14, 15work1747.63761emission reduction (Annex 2)
2018-01-012018-12-31201831831942LIMITED LIABILITY COMPANY "DTEK SKHIDENERHO"4.1power-generating unit3, 4work1114.55286emission reduction (Annex 2)
2018-01-012018-12-31201831831942LIMITED LIABILITY COMPANY "DTEK SKHIDENERHO"4.2power-generating unit5work557.24939limitation of working time - 40 thousand hours (Annex 2)
2018-01-012018-12-31201831831942LIMITED LIABILITY COMPANY "DTEK SKHIDENERHO"5.1power-generating unit8, 9work1114.56081emission reduction (Annex 2)
2018-01-012018-12-31201831831942LIMITED LIABILITY COMPANY "DTEK SKHIDENERHO"5.2.1power-generating unit6work557.25917limitation of working time - 40 thousand hours (Annex 2)
2018-01-012018-12-31201831831942LIMITED LIABILITY COMPANY "DTEK SKHIDENERHO"5.2.2power-generating unit7work557.24903limitation of working time - 40 thousand hours (Annex 2)
2018-01-012018-12-31201842360523LIMITED LIABILITY COMPANY "DTEK MYRONIVSKA TETS"6work814.72728emission reduction (Annex 2)
2018-01-012018-12-31201800130872JOINT-STOCK COMPANY "DTEK DNIPROENERHO"7power-generating unit1, 2, 3, 4work3140.36228emission reduction (Annex 2)
2018-01-012018-12-31201800130872JOINT-STOCK COMPANY "DTEK DNIPROENERHO"8power-generating unit5, 6, 7does not work58750limitation of working time - 40 thousand hours (Annex 2)
FieldNameDescription
date_startDate start
date_endDate end
yearYear
company_codeUSREOU company code
company_nameCompany name
unit_idUnit ID
unit_typeUnit type• power-generating unit • boiler plant • PTVM-100 (Oil/Gas Fired Boilers) • VK (Water Heater) • GPA-25S, GPA-C-16, GTK-25I, GTN-16, GPU-16 (Gas Pumping Units)
unit_numberUnit number
unit_statusUnit operation status• work • does not work • replacement of equipment • decommissioned • damaged as a result of hostilities • possibly destroyed • unknown
capacity_installedNominal thermal capacity of the unit, MWMW
operation_timeNumber of unit operation hours, h/yearhours/year
requirementEstablished installation requirement according to NERP• emission reduction • limitation of working time – 20 / 40 thousand hours • decommissioning is planned after 40 thousand hours of work • replacement of the equipment in accordance with the requirements of the Directive 2010/75/EU • is not established
noteNote
NameUpdate dateLines numberSizeFormatDownload

2022_12_31_uk_kharakterystyky_stantsii_npsv.csv

1205

268.89 kB

UK
CSV

2022_12_31_uk_kharakterystyky_stantsii_npsv.xlsx

1205

85.67 kB

UK
XLSX

2022_12_31_en_kharakterystyky_stantsii_npsv.csv

1205

227.59 kB

EN
CSV

2022_12_31_en_kharakterystyky_stantsii_npsv.xlsx

1205

76.4 kB

EN
XLSX