Information on the amount of investments in renewable energy (RES) power plants, which have a "green" tariff and the amount of installed capacity according to the State Agency on Energy Efficiency and Energy Saving of Ukraine assesment. The data are calculated on the average annual rate of hryvnia according to the National Bank of Ukraine data. 

The data do not include the temporarily occupied territory of AR Crimea. For the information, the total capacity of the facilities built before 2014 in AR Crimea amounted to 495 MW, and the total amount of investment - 800 million EUR.

Update date March 13, 2023, 5:26 p.m. Annually
Data for period 01.01.2009 - 31.12.2022
Organizations
SAEE
Sources
More Show
Field Name Description
date_start Date start

-

date_end Date end

-

year Year

-

generation_type Power plant type

• Industrial Solar Power Plant
• Household Solar Power Plant
• Wind Power Plant
• Small Hydropower Plant
• Biomass-fired Power Plant
• Biogas-fired Power Plant

capacity_installed Installed capacity, MW

MW

amount_eur Investment amount, EUR million

EUR million

amount_uah Investment amount, UAH million

UAH million

Field
Name
date_start
Date start
Description

-

Field
Name
date_end
Date end
Description

-

Field
Name
year
Year
Description

-

Field
Name
generation_type
Power plant type
Description

• Industrial Solar Power Plant
• Household Solar Power Plant
• Wind Power Plant
• Small Hydropower Plant
• Biomass-fired Power Plant
• Biogas-fired Power Plant

Field
Name
capacity_installed
Installed capacity, MW
Description

MW

Field
Name
amount_eur
Investment amount, EUR million
Description

EUR million

Field
Name
amount_uah
Investment amount, UAH million
Description

UAH million

2022_12_31_uk_investytsii_zelena_heneratsiia.csv
Name: 2022_12_31_uk_investytsii_zelena_heneratsiia.csv
Format: UK CSV
Size: 13.43 KB
Count of rows: 169
Date updated: March 13, 2023, 5:26 p.m.
2022_12_31_uk_investytsii_zelena_heneratsiia.xlsx
Name: 2022_12_31_uk_investytsii_zelena_heneratsiia.xlsx
Format: UK XLSX
Size: 10.93 KB
Count of rows: 169
Date updated: March 13, 2023, 5:26 p.m.
2022_12_31_en_investytsii_zelena_heneratsiia.csv
Name: 2022_12_31_en_investytsii_zelena_heneratsiia.csv
Format: EN CSV
Size: 12.35 KB
Count of rows: 169
Date updated: March 13, 2023, 5:26 p.m.
2022_12_31_en_investytsii_zelena_heneratsiia.xlsx
Name: 2022_12_31_en_investytsii_zelena_heneratsiia.xlsx
Format: EN XLSX
Size: 10.78 KB
Count of rows: 169
Date updated: March 13, 2023, 5:26 p.m.
Name Format Size Count of rows Date updated
2022_12_31_uk_investytsii_zelena_heneratsiia.csv UK CSV 13.43 KB 169 March 13, 2023, 5:26 p.m. Download
2022_12_31_uk_investytsii_zelena_heneratsiia.xlsx UK XLSX 10.93 KB 169 March 13, 2023, 5:26 p.m. Download
2022_12_31_en_investytsii_zelena_heneratsiia.csv EN CSV 12.35 KB 169 March 13, 2023, 5:26 p.m. Download
2022_12_31_en_investytsii_zelena_heneratsiia.xlsx EN XLSX 10.78 KB 169 March 13, 2023, 5:26 p.m. Download