Investments in "green" generation capacity
Information on the amount of investments in renewable energy (RES) power plants, which have a "green" tariff and the amount of installed capacity according to the State Agency on Energy Efficiency and Energy Saving of Ukraine assesment. The data are calculated on the average annual rate of hryvnia according to the National Bank of Ukraine data.
The data do not include the temporarily occupied territory of AR Crimea. For the information, the total capacity of the facilities built before 2014 in AR Crimea amounted to 495 MW, and the total amount of investment - 800 million EUR.
Field | Name | Description |
---|---|---|
date_start | Date start |
- |
date_end | Date end |
- |
year | Year |
- |
generation_type | Power plant type |
• Industrial Solar Power Plant |
capacity_installed | Installed capacity, MW |
MW |
amount_eur | Investment amount, EUR million |
EUR million |
amount_uah | Investment amount, UAH million |
UAH million |
Name | Format | Size | Count of rows | Date updated | |
---|---|---|---|---|---|
2022_12_31_uk_investytsii_zelena_heneratsiia.csv | UK CSV | 13.43 KB | 169 | March 13, 2023, 5:26 p.m. | Download |
2022_12_31_uk_investytsii_zelena_heneratsiia.xlsx | UK XLSX | 10.93 KB | 169 | March 13, 2023, 5:26 p.m. | Download |
2022_12_31_en_investytsii_zelena_heneratsiia.csv | EN CSV | 12.35 KB | 169 | March 13, 2023, 5:26 p.m. | Download |
2022_12_31_en_investytsii_zelena_heneratsiia.xlsx | EN XLSX | 10.78 KB | 169 | March 13, 2023, 5:26 p.m. | Download |